6 Rules for Managing Your Contractors

by J Scott on April 14, 2010 · 10 comments

  

In my opinion, the most difficult aspect of being a first-time house flipper is managing your contractors. Perhaps it’s because I came into this business with no construction experience, or perhaps I’m just not a terrific “people person,” but regardless, on my early flips, ensuring that my contractors performed to expectation was by-far the most frustrating part of the job.

Luckily, since I started this business, I have built up a very reliable, and very trustworthy crew; but every once in a while, I still need to hire contractors who I’ve never worked with before, and therefore run the risk of having them cause difficulties on my projects. Remember, even the most experienced rehabbers with the best crews are going to need rules in place to ensure that their contractor experiences are good ones, and that a bad contractor doesn’t risk an entire project.

Given that, I wanted to take a few minutes to summarize some of the methods I have put in place to ensure that I only hire and keep the best, brightest, and most motivated contractors, and to ensure that my contractors stay motivated throughout the project(s).

Here are My 6 Rules for Managing Your Contractors

1. Cover yourself with contracts and paperwork.

This is so important that I have a separate article on this topic…check it out

2. Always check references before you hire a contractor.

Many rehabbers will ask contractors for references, but how many will actually check out those references before hiring the contractor? You don’t necessarily need to interview past clients of the contractor, but at least take a look at the work that was done. For example, if your contractor is a painter or a roofer, it should be fairly easy to obtain a list of addresses the the contractor worked on, and then just drive by the exterior of the house to see the quality of work.

Perhaps the contractor has work currently going on (if he doesn’t, why not?!?!?). Will he allow you to stop by and check out the crew, check out the progress, evaluate the safety precautions the crew is taking, etc?

Worst case, if you have any doubts, you should call previous clients of the contractor. Ask them pointed questions about how well the contractor maintained the schedule, the budget and the overall quality of the work. Lastly, ask the client if s/he would hire the contractor again…the answer to this question will tell you everything you need to know.

3. Never pay ahead of the work that’s been completed.

Many contractors will tell you that they can’t start on your project until you pay them some amount of the total cost upfront. Then, they’ll have you continually pay them throughout the project to ensure that you’ve always paid more than the work that has been completed.

This is backwards! If your contractors ever walk off the job or fail to show up for work, you’ve paid more than the work that’s been completed, and YOU LOSE MONEY. Instead, your contractors should be working ahead of your payments, not the other way around. This way, if the contractor chooses to not show up, he’s done at least some of the work for free and HE LOSES MONEY.

If the contractor insists on not taking the risk of you not paying, then offer to pay many installments. For example, in the most extreme case, you can pay the contractor at the end of every day for the work that was completed that day. This ensures that the contractor never has to worry about losing more than a day’s pay to an unscrupulous investor who doesn’t pay, and you can ensure that if the contractor ever doesn’t show up, you’re not out any money.

Certainly, there will be cases where the materials are a considerable portion of the total contractor cost (such as getting a roof replaced or sheet-rocking an entire house), in which the contractor will rightly want some payment upfront to ensure he not buying a bunch of materials he never gets paid for. In these cases, you can agree to pay for the materials upfront, but also ensure that the contractor delivers the materials to the property the same day. Again, this will protect both sides.

4. Get a schedule from your contractor before the work starts.

Whether you write the schedule or your contractor writes the schedule, it’s important to ensure that there is an agreed-upon schedule for any project, no matter how small the project might be. There are a couple reasons for this:

  • It keeps the contractor accountable for getting the finished product completed by the finish date. If you have no idea what 50% looks like, how do you know if the contractor has completed 50% of the project by half-way through the schedule.
  • It ensures that you don’t pay ahead of the work completed. Again, if you don’t have a schedule, how do you know if it’s time to be paying the 50% completed installment?
  • It helps ensure that other contractors stay on schedule and that your project stays on schedule. If your sheetrock guy decides that next-week is better for him to finish than this week, how does that impact your overall schedule? Is this going to impact your painter, your flooring guy, your trim guy, etc? It will likely impact the entire project!

5. Make sure you visit the job site at least a couple times a day, and make sure you “drop in” by surprise.

Best case, you or someone on your management team will be at the property any time a contractor is working there. Unfortunately, this isn’t always realistic, and if you have a trusted crew that you’ve worked with in the past, this may not even be necessary. But, if you’re not going to be at the property full-time, make sure you at least check in a couple times a day — on surprise visits.

Too many investors will let their contractors know exactly when they’ll be at the property. For example, they’ll meet the cabinet guy at 9am to let him in the house, and then say, “I’ll be back at 2pm to check up and see if you need anything.” While this won’t matter with good contractors, if you have a bad one, you’ve now given him the information he needs to slack off for the next couple hours or go finish up another job down the street.

I know this sounds far-fetched, but there are LOTS of contractors who overbook their schedules, and will use any opportunity they can to make it seem like they’re in two places at once. The really bad ones will actually be making extra money by doing this, not just screwing up schedules. You want to be sure that your contractors are working when you’re not around, and that they’re working on YOUR project.

To avoid problems, don’t tell your contractors when you’ll be visiting the site, and don’t be consistent. For example, if you always stop by at lunch and after work, take a late lunch on occasion to keep your contractors on their toes. Or send a friend over to check on progress every once in a while if you can’t do it yourself.

6. At the first sign of trouble, don’t hesitate to get rid of a contractor.

While it may be a pain in the ass to have to find a replacement mid-project, it’s much worse to have to deal with a bad contractor for any amount of time.

The biggest mistake I see rehabbers make is not getting rid of bad contractors quickly enough. They will rationalize that the contractor will get better (trust me, contractors don’t change), or that the project is almost over and they’ll just not hire the contractor in the future.

In most cases, if the contractor is not getting the job done early-on in the project, things will just get worse (not better!) as the project wears on. Plus, a bad contractor will not only hurt his part of the project, but will also affect the morale of the rest of the crew, who are just trying to finish up so they can move onto the next job.

Let me leave it at this: If you have any doubts about a contractor, go find another one. There are plenty of great contractors out there, and it’s not worth your frustrations not to have them.

Email *
  



{ 10 comments… read them below or add one }

Anthony Labita April 14, 2010 at 12:54 pm

Hi,

Another way I try to control the chaos on a flip is what I call my control wall. I hang all plans (protected), subs name (architect if applicable) and numbers and a responsibility list in a single location. It may take time but after doing this a few times with the same subs they begin to look for the information. It eliminates excuses and spells out who is on the hook for what. I expect my subs to communicate with each other if necessary

Recently I have started a calendar where all the deadlines are defined. This way the plumber should now when the framer is done and can start their rough in.

As with my other job it comes down to open communication.

Thanks,

Reply

Debra Sinick April 15, 2010 at 12:56 pm

Good list for anyone having work done in their home, even if they are not a “flipper.” Most people don’t think to stop by, but it is important not only to see that a contractor is not slacking off, but to check the quality of the work. It amazes me how many times a building inspector who is checking a home out for a buyer catches problems caused by shoddy workmanship.

Reply

Liz Voss April 15, 2010 at 3:44 pm

Good feedback J Scott. Biggerpockets also had an article a while back where the investor had a payment schedule for the contractors. He paid a percentage upon certain stages of completion. This may work well for those contractors who want some type of payment.

Reply

Anonymous April 29, 2010 at 1:42 pm

Don’t forget to make sure they are licensed and bonded. Many people tend to overlook this and it can end up costing you big time. Finding their contractors license is pretty easy. Just check out your states government websites to verify that their license is still active.

Reply

Mark Bechler June 16, 2010 at 7:12 pm

When I work for a client that has it together like Anthony Labita makes my and the other Subs work so much easier, how-ever most people dont know what to expect.

So As a sub I would like to thank the post writer for trying to help people understand whats involved, trust me if you dont Subs and clients can get pretty messed up. Can get pretty ugly fast if the client doesnt understand whats going on and all the sudden is out of cash because we are doing the work he wants.

Also in PA all contractors must have the AG 1-800 number and insurance listed on any advertisement so if they dont think twice about hiring them.
Mark Bechler

Reply

Anonymous July 13, 2011 at 10:20 pm

Wish I had read this 2 months ago. Tonight I’m deciding this very thing. I’m rationalized why I should keep this contractor and the only reason is that I don’t want to go find another contractor. Even thought about keeping part of his crew for a portion of the work. Thanks guys. I’ve just made my decision. Gotta make some calls tomorrow!

Reply

Rita Phillips December 15, 2012 at 6:43 am

GREAT article! It covers so many aspects whether you’re a veteran or not. Only comment I might add would be not to hire friends as one of your contractors. It not only makes them more difficult to fire, you risk loosing the friendship all together. Which is more important?

Reply

phil May 15, 2013 at 9:31 am

i too wish i had read this dont make the mistake i did the contractor is not your friend and do not verble agree on anything get it in writing. This guy i used had great reviews except for 2 people and he had excueses for them all. his excuse was homeowners wanting everything free even though it was about the quality of work. I had a colored concrete floor put in and the job was botched so floor had to be tiled but this contractor said i had to pay for the clear coat and grout for damaged floor and these items were never put on colored concrete floor. Also all pre hung door hinges were removed and pins pulled and mixed up and put back on some of the hinges didnt fit in cut out and screws stripped his comment was they are all the same and that sometimes happens all hinges are the same but i found some were on upside down . Be careful get everything in writing and all change orders written up and signed by both.There is alot more but it would take 4 pages

Reply

Amie D. May 26, 2013 at 10:35 am

Thanks for this. I know I’ve gotten burned with this more than a few times over the years. Good tips.

Reply

Kevin Polite October 30, 2013 at 8:50 pm

Good article. I have a contractor now who is very good and we feed off each other ideas. My problem is that he isn’t very well organized. This is the first I’ve used and he has good references, but why would you put gutters on before you paint. It wasn’t because he didn’t know , but well. We are 90% done so definitely not worth to get rid of him, but I wonder by putting in place the rules @j scott this would help

Reply

Leave a Comment

Comment Policy:

• Use your real name and only your name in the field designated for your name.
• No keywords allowed as anchor text in the name or comment fields.
• No signature links allowed under your comments
• You may use links in the body of your comment, but it must be relevant to the discussion at hand, and not merely be some promotional link.
• We will have NO reservations about deleting your content if we feel you are posting merely to get a link without adding value to our discussion.
If you add value, but still post keywords, we'll use your comment, but remove your link and keywords.
• For more information about acceptable practice, see our site rules.

Want your photo to appear next to your comments? Set up your Gravatar today.

Previous post:

Next post: