Chicago Permitting and Architecture
Hi All!
I need folks expertise on things.
I already pulled a permit for some basic stuff- window replacement etc but now I'm thinking of pulling another permit everything that doesn't require architectural plans. Is it a flag/weird for the city if I pull multiple permits on the same project? I'm the licensed GC on the project.