Sorry for the delay.  Here what I have done with the Hallway bath up to this point.

Before everything was gutted to the studs.

Normal 1420169715 20141029 093310 Android

Dry wall and tub in:

Normal 1420169950 20141116 083555 Android

Added an arch and removed the door to the linen closet.

Normal 1420169995 20141116 083601 Android

Arch into the shower and hardie backer installed in the shower.

Normal 1420170080 20141116 185821 Android

Tile done on floor and trim. Texture and paint.  Still have a little tile work to do in the shower.

Normal 1420170327 Img 20141216 213728341

Under mount sinks to have tile counter top and backsplash.  New almond color windows were installed on the exterior and adds a little class with the grids.

Normal 1420170418 Img 20141216 213738545

Normal 1420170633 Img 20141218 160745089

Testing out the window trim, how does it look?  The next picture everything should be done.