TheScottPad.com is Now Live!

TheScottPad.com is Now Live!

J ScottPro Member
Moderator
Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes

Interested in following along with our most ambitious project ever (both online and in the real world)?

My wife and I are getting ready to tear-down and rebuild our personal residence, and we're documenting the entire process online.  This includes live video streaming, time-lapse videos, detailed plans/specs, pictures, daily blog updates, budgets, schedules, contractor bids/invoices, and a whole lot more!

Check out the site here:  TheScottPad.com

Please like our Facebook page:  TheScottPad FB Page

Follow us on Twitter:  TheScottPad Twitter Page

Let me know if there is anything else you'd like to see or if you have any questions!

By the way, we're planning on Demo to start next week...watch it live on the site!

12Reply
149 views

Most Popular Reply

Investor · Indianapolis, IN · Member since 2013 · 27 posts · 5 votes
12y

This is pretty awesome!. I just checked out the cam and within a few seconds, saw a call drive-by and the cam quality was incredible. The frame rate had the car going by at real time speed. Therefore the demo should look pretty awesome! I'm going to mark my calendar (while on vacation @ Hilton Head Island) to make sure I catch the demo!

Although my start in REI is slow (still scaling back my lifestyle to get in a better position to invest), there is no doubt the generosity of your time spent sharing and documenting your experiences will help save me money hand over fist. A serious thank you from a small time newbie.

Good luck J and Carol -- Absolutely love TheScottPad!

See this reply in the discussion

90 Replies

Jump to latestLatest
  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Walls completed:

    http://www.thescottpad.com/walls-completed-picture...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Ground plumbing, waterproofing and draintile completed:  

    http://www.thescottpad.com/waterproofing-completed...

    All inspections (waterproofing, draintile, ground plumbing) passed, termite pre-treatment done and now ready to finish up concrete flat work (basement slab, garage slab, front porch and areaway steps).  Unfortunately, our foundation company is slammed and I'm not their #1 priority (how dare them! :-), so I'll be waiting until later this week to start the backfill and prep for the final concrete.

    Hopefully by the end of the weekend, the backfill will be completed and the big mound of dirt in front of the live streaming video camera will be gone...  :)

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    As hoped, backfill completed this week, and we're scheduled for final flat-work prep, insepction and pour by the end of this coming week.  Assuming no bad weather, that would mean framing will start next week.

    Here are some post-backfill pictures:

    http://www.thescottpad.com/backfill-completed-pict...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Slab prep completed yesterday, inspections passed today and pouring the concrete tomorrow:

    http://www.thescottpad.com/slab-prep-completed-pic...

    Framing starts next week...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Foundation is completed...here are lots of pictures:

    http://www.thescottpad.com/fab-friday-photos-week-...

    Starting the framing next week.  Any BP folks in the area who want to come out and watch/learn, let me know...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    FRAMING DAY 1!

    By far the most productive day I've ever had on any job-site.  Here's a time-lapse video from just the first 5 hours (the crew worked an 11-hour day and completed the framing of the entire first floor and most of the basement):

    Tomorrow they'll frame the second floor, Thursday is a day off (they have to finish another job), and Friday they'll put the roof on.

  • Investor · Peachtree Corners, GA · Member since 2014 · 1k+ posts · 1k+ votes
    12y

    Looks like you'll be celebrating turkey day there!

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y
    Originally posted by @Cal C.:

    Looks like you'll be celebrating turkey day there!

     I haven't sent out the invitations yet!  We still have a lot of things that have to happen perfectly to get to that date, but at least we haven't ruled it out yet!

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    FRAMING DAY 3:

    Unbelievable, but we're under roof after 3 days of framing...

    Here's time lapse video from day 3:

  • Professional · San Diego, CA · Member since 2014 · 232 posts · 20 votes
    12y

    @J Scott Interesting, actually I am looking at some infill opportunities utilizing modulars. will you provide insight? btw does your book provide insight for modular construction on raw land or previous tear down?

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y
    Originally posted by @Fred Sams:

    @J Scott Interesting, actually I am looking at some infill opportunities utilizing modulars. will you provide insight? btw does your book provide insight for modular construction on raw land or previous tear down?

     I have no experience with modular.  Where I live, there's still somewhat of a stigma with modular houses, and the sale price will reflect it...so I don't know anyone building modular in this area...

  • Karen MargraveBusiness Member
    Moderator
    Realtor, General Contractor, and Developer · Redding, CA · Member since 2009 · 7k+ posts · 4k+ votes
    12y

    That is going up REALLY fast! I love watching the time lapse photography. it adds so much more excitement to the post! Thanks! 

  • Roy N.Pro Member
    Rental Property Investor · Fredericton, New Brunswick · Member since 2013 · 7k+ posts · 4k+ votes
    12y
    Originally posted by @J Scott:

    FRAMING DAY 3:

    Unbelievable, but we're under roof after 3 days of framing...


    I showed this to my carpenter this morning ... he just shook his head and walked away.

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Other than the interior stairs and the punch work, we finished framing today (after a 13 hour Saturday)...front porch is done, back deck & porch is framed, interior is complete, lateral bracing is done, blocking is in, etc.  

    Roofing starts Monday.  We'll get the stairs in on Monday or first thing Tuesday (depending on when they're delivered) and hopefully get our sheathing inspection on Tuesday.   Wednesday we'll wrap the house and get the windows and exterior doors in.  

    We're also installing a new water meter and running our water and sewer lines this coming week.

    Everything was going smoothly until we ran into our first interesting problem today -- the foundation company forgot to pour one of the porch footers in the back of the house.  In this picture, there is supposed to be one more footer/pier (you can look at the drawings to see where):

    http://www.thescottpad.com/wp-content/uploads/Plan...

    Nobody noticed (including me) that it was just plain forgotten.  Luckily, based on the design, this appears to be the least needed support for the deck/porch, but I'm certainly not an engineer, so I don't know the best fix. 

    The area has been backfilled and the deck/porch are framed above where this pier is to sit, so digging down 8' probably isn't an option.  Likewise, pouring a footer on backfilled soil probably isn't the right solution either.  Anyway, I'm going to talk to my foundation company and my engineer on Monday, and we'll see what they come up with.  Perhaps there's a cheap solution and I'll actually save some money on the concrete they didn't pour...  :-)

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Busy week coming up...here's the schedule:  

    http://www.thescottpad.com/week-7-schedule/

    Any BP members in the area want to stop by and visit, just let me know!

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Roof is shingled, new water meter is installed, interior stairs are in, and we just passed our sheathing/bracing inspection:

    http://www.thescottpad.com/roof-water-meter-pics/

    Off to a good start this week!

    If we can get our windows and house wrap delivered this morning, our window installer is ready to go and we can get this thing dried-in by tomorrow...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Finished the framing today, got the house wrapped and started installing windows/doors. The carpenters outlasted me at the house -- they're still working and who knows, they may finish the windows and doors this evening...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    As of two days ago, we're dried-in...

    Ahead of schedule by a couple days and wasn't able to pull any contractors in, so nothing new has happened since Wednesday.  Next week we do HVAC rough-in, plumbing rough-in and framing punch-list.  Following week is electrical rough-in and sprinkler rough-in.

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Crazy successful week at the house:

    - Main water and sewer lines installed

    - HVAC rough-in completed

    - Plumbing rough-in about 2/3 completed

    - Electrical rough-in started

    - Framing punch out completed (including several custom changes based on new ideas we had after actually seeing the house framed)

    - Porches and Deck framing started

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Some pics from last week:

    http://www.thescottpad.com/fab-friday-photos-week-...

    And this week's schedule:

    http://www.thescottpad.com/week-9-schedule/

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Mechanicals and electrical pics from this week:

    http://www.thescottpad.com/electrical-mechanicals-...

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y

    Passed our plumbing, electrical, HVAC and sprinkler rough-ins last week, and just passed our framing inspection today!  I consider this to be the mid-point of the project...yay!

  • Investor · Peachtree Corners, GA · Member since 2014 · 1k+ posts · 1k+ votes
    12y

    That's great that things are moving right along.  You seem to have some very professional people doing your work, which means you are doing an excellent job vetting them!

  • J ScottPro Member
    Moderator
    OP
    Investor · Sarasota, FL · Member since 2008 · 17k+ posts · 17k+ votes
    12y
    Originally posted by @Cal C.:

    That's great that things are moving right along.  You seem to have some very professional people doing your work, which means you are doing an excellent job vetting them

    Or I'm just paying too much... :-)

  • Investor · Peachtree Corners, GA · Member since 2014 · 1k+ posts · 1k+ votes
    12y
    Originally posted by @J Scott:
    Originally posted by @Cal C.:

    That's great that things are moving right along.  You seem to have some very professional people doing your work, which means you are doing an excellent job vetting them

    Or I'm just paying too much... :-)

     Somehow I think you would have eliminated high bids when you did multiple bids for each part of the project!