Investor · Marbury, MD · Member since 2017 · 52 posts · 57 votes
4y
Put cabinets and toilets down first then install the planking. Nothing gets installed on top of the planking cause they need to expand and retract with temperature changes, plus you need at least 1/4" space between the flooring plank and baseboards or walls to allow for movement
Investor · Fernandina Beach, FL · Member since 2014 · 557 posts · 374 votes
4y
Solid vinyl plank flooring does not expand and contract. Not enough to be of any concern whatsoever. The old wood laminate flooring rules do not apply to vinyl.
With that said I install vinyl plank after the vanity and cabinets, and before the toilet.