Easy Permits in Chicago | Rough Inspections Required? Or not?

Easy Permits in Chicago | Rough Inspections Required? Or not?

Lender · Chicago IL · Member since 2020 · 357 posts · 229 votes

I'll admit, I'm totally confused about easy permits and the required inspections.

It was our understanding, per 2 different professionals (an architect & licensed GC), that we do NOT need rough inspections when doing a rehab with an easy permit. However, upon scheduling our final inspection for a rehab project (which we were told we DID need), the city told us we needed rough inspections. 🤦‍♀️

As you can imagine, this has been an absolute nightmare of a process to backpeddle and get everything 'righted'. But it still doesn't solve the mystery for me. Do we, or don't we, need rough inspections with an easy permit? I know the city said we do but...

Let me elaborate--the only walls we opened were to update associated piping with new plumbing fixtures and electrical fixtures/switches. This was all on the easy permit. Thus, it would make sense to me that roughs were NOT necessarily, by default required. Add to that the fact that 2 industry professionals told us explicitly that they were NOT necessary, and hence, perhaps you see where my confusion comes from.

Did Chicago change the laws recently? Did something else change? Is this just a decision left up to the discretion of whoever happens to receive the inspection request?

Not gonna lie-- It feels like a moving target with city inspectors at times. One inspector comes out for a rough plumbing inspection and wants a) changed. Even though it's up to code, as is. So you change a) and another plumbing inspector comes out later and says what's a) about? And you try to say that the previous inspector wanted it like that but they don't seem to care and they make you change it again...and this can go on, and on, and on.

Is it just me or are we living in some strange universe where plumbing and other codes don't matter, and inspectors can say and do whatever they want with no recourse? And what about the architects and GCs...shouldn't they know the rules and any applicable changes as they occur?

Do we have recourse? Is there a way to avoid this? Whom can we talk to/complain to (without shooting ourselves in the foot)? Is there a way to hold city people accountable without a lawsuit? Looking for proactive and practical solutions and suggestions.

Thanks guys.

*Oh, and I cross posted this in another forum. I posted it first in rehabbing and flipping, and then copied it over here because I thought I would get more Chicago related people to respond. :)

0Reply
36 views

2 Replies

Jump to latestLatest
  • Investor · Chicago, IL · Member since 2015 · 138 posts · 54 votes
    5y

    @Jennie Berger

    We have done alot of Easy permits in the City of Chicago and have pulled permits to upgrade plumbing, electrical, HVAC and framing. I never have had a rough inspection or final inspection as we followed the guidelines of the easy permit process. You mentioned that you did some plumbing and I believe you mentioned electrical which would require a rough inspection and a final inspection. Here's the information for easy permit process. You can DM me if you want to discuss further.

    The Easy Permit Program is a streamlined permitting process for small, simple home and building improvement projects. It allows home and building owners to obtain a permit to repair or replace existing features of a building or make minor modifications without providing architectural plans. You can use the Easy Permit Process for the following project types:

    Inside the Building

    Drywall Replacement (greater than 1,000 square feet)

    Exterior Doors*

    Fire Damage (buildings with 24% damage or less, require demolition inspection approval and a separate electrical permit)

    Furnaces (replacement of existing gas-fired only in all commerical buildings and residential buildings with 4 or more dwelling units)*

    Existing Plumbing Fixture Replacement

    Electrical Work (requires an electrical contractor)**

    Counter Top and Cabinet Replacement (required for condos only)

    Outside the Building

    Doors/Window Replacement (4 dwelling units or more, if same size, same location)*

    Fences (non-masonry fences greater than 5 ft. in height or masonry walls of any height)*

    Sheds greater than 150 square feet

    Detached frame garages, up to 600 square feet in area, without rooftop deck*

    Trash enclosure (wood only)

    Porch repair (if a violation report says permit for repairs only)

    Masonry work (mason contractor required)

    Tuckpointing (mason contractor required, masonry cleaning and grinding require a pollution prevention permit from CDPH)

    Roofs (If adding a layer, a general contractor or primary owner can perform the work)*

    Roofs (If total tear-off, must employ Illinois-licensed roofing contractor)

    Lintel repairs (6’-0” opening maximum, mason contractor required)

    Scaffolding (an easy permit can be received the same day if the work over the public way has been approved by the Chicago Department of Transportation)

     * For this project type in an all-residential building, the easy permit may be obtained online.

    ** Electrical permits may be obtained online by licensed electrical contractors only.

  • Lender · Chicago IL · Member since 2020 · 357 posts · 229 votes
    5y

    Thanks for your feedback @Rachel Imhof!

Join the conversationCreate a free account to reply, vote on answers and follow this thread.