How involved are you in an NNN lease?

How involved are you in an NNN lease?

New to Real Estate · Member since 2026 · 16 posts · 7 votes

If you have a NNN lease, in which the tenant is responsible for all building and grounds maintenance, how do you ensure maintenance gets done? If the roof has reached the end of it's life, for example, do you ask the tenant to replace it, or do you let them make that call? How would you coordinate this with the tenant?

0Reply
468 views

5 Replies

Jump to latestLatest
  • Property Manager · Western Pa · Member since 2026 · 4 posts · 1 vote
    2mo

    Even in an NNN lease, I wouldn't recommend the owner/property manager becoming completely hands-off. The tenant may be financially responsible for maintenance and repairs, but the owner still has an interest in protecting the condition and value of the asset.

    I would require the tenant to notify management of major repairs, replacements, or conditions that could affect the building. For something like a roof nearing the end of its useful life, I’d have it professionally inspected, document the condition, and obtain estimates before determining whether replacement is required under the lease.

    I’d also build in periodic property inspections and require documentation for major work: invoices, warranties, permits when applicable, and proof that licensed/insured contractors were used.

    The key for me would be verification without taking over the tenant’s responsibility. The lease determines who pays, but ownership/management should still have a system for making sure the asset is being properly maintained.

  • Real Estate Agent · Memphis · Member since 2026 · 632 posts · 363 votes
    2mo

    I’d stay involved even if the tenant is responsible for the maintenance. My approach would be:

    1. • Keep periodic inspections or condition reports so I know how the major systems and building components are holding up.

    2. • Require documentation that scheduled maintenance is actually being done.

    3. • If something major like the roof is nearing end of life, get a professional assessment rather than waiting for the tenant to decide when it has failed.

    4. • Then go back to the lease to determine who is responsible for the repair or replacement and coordinate the work from there.

    I’d give the tenant responsibility for what the lease assigns to them, but I wouldn’t give up visibility into the condition of an asset I still own.

  • Investor · Fairfax, VA · Member since 2015 · 1k+ posts · 806 votes
    2mo

    I would stay involved especially with the smaller mom and pop tenants as they tend to let things slide until it breaks. I require regular hvac, fire alarm, and plumbing inspections. If they can't produce it at the end of the lease I get to keep the deposit. The HVAC is important to maintain to prolong its life. The roof is a tough one but you have to read the lease on it. Sometimes the tenant will pay a portion of the roof based on when they took occupancy. For example: New tenant occupies building, but the roof is already 15 years old. Roof needs replaced in 5 years, so they would pay 25% of cost since that is the percentage of time that they occupied the property. If its an absolute NNN lease vs a nnn lease than the tenant pays 100%. Details are in the lease so read it carefully.

  • Stuart UdisPro Member
    Attorney · Philadelphia · Member since 2018 · 2k+ posts · 3k+ votes
    2mo

    It is important to understand your tenant's qualifications and capabilities. A lot of landlords push for NNN leases because they sound good in theory, but I usually advise my clients to avoid them unless you have a tenant that possesses the sophistication, risk management procedures and systems to adequately care for the property and look out for the landlords interest. As the property owner you want work completed timely by licensed and insured vendors and contractors carrying appropriate insurance and ensuring the property owner receives additional insured endorsements. If the tenant is not realistically capable of meeting those operating standards as a landlord you are better off with a different lease structure.

  • Coral Springs, FL · Member since 2018 · 498 posts · 119 votes
    1mo

    the big thing with nnn that catches people off guard is deferred maintenance. tenant stops doing the little stuff and suddenly the hvac is shot and there's water damage everywhere. the "net" part of the lease doesn't mean much if the tenant just ignores things until they get expensive.

    i'd say the lease language around capital improvements is the single most important part. who pays for the roof, who pays for structural, what happens if something fails in year 2 vs year 8 of a 10 year lease. get that ironed out before signing because it's way harder to figure out after.

    stuart's point about tenant capability is spot on. a national tenant with a maintenance department is a very different nnn experience than a local small business. know who you're dealing with.

Join the conversationCreate a free account to reply, vote on answers and follow this thread.