This order has saved me a lot of headaches. I test everything that moves or runs water before any paint goes on. Run the dishwasher and laundry if there is any, flush toilets, check under sinks, test outlets, locks, and heaters. Finding a slow leak after painting means cutting into a finished wall. Next is clean, then repairs, then paint, then floors last so they do not get marked up. I also change lock codes and check smoke alarms at the end, and take the same dated photos from the same spots as move-out. It takes a bit longer up front, but the place shows better and I get far fewer calls in the first month.
Keep the exact paint brand, color and sheen with those before-and-after photos too. “White in the bedrooms” won’t help the next person doing a touch-up. A photo of the can label and a room-by-room note would save the guessing, especially when a different handyman handles the next turnover.
Daniel and Matthew, thank you both. Daniel, testing everything that runs water before any paint goes on is a smart order, since a slow leak found after painting means cutting into a finished wall. Matthew, keeping the paint brand, color and sheen with a photo of the can label would save the next handyman a lot of guessing. Do either of you keep that paint record in the unit file, or on a separate sheet?