[CO] 39 Acres ($90K)– 30% Return – Partner for Clothing-Optional Wellness Resort

WantFinancingPrivate Money
Classifieds

[CO] 39 Acres ($90K)– 30% Return – Partner for Clothing-Optional Wellness Resort

Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes

Hey everyone,

I have a signed purchase contract on 39 acres in El Paso County, Colorado. Escrow is open with a licensed Colorado title company, and I’m looking for a financial partner to help buy the land and build the project.

The land costs $90,000. I am paying the $900 earnest money myself to lock up the deal. We have 60 days to inspect the property (through January 15, 2027), plus three optional 30-day extensions while we get county permits approved.

During the first 60 days, we will spend $7,500 on soil tests, a land survey, well paperwork, and county checks. If we find any dealbreakers during those 60 days, we walk away—I get my $900 back, and the rest of your money ($368,655) comes straight back to you from escrow.

Great News on Water:
The State of Colorado already confirmed in writing that this property has a working deep well on file and qualifies for a commercial well permit. Having a real well already in the ground removes our biggest rural land risk and saves us a ton of drilling money.

What We Are Building:
We are building a 100% clothing-optional outdoor wellness and sports resort. El Paso County already confirmed this is allowed under the current zoning with a Special Use Permit—no rezoning needed. Here is what the resort will include:

  • A heated 75'×30' saltwater pool with an 8-foot slide

  • A 15-person covered hot tub, 20-person cedar sauna, and cold plunge

  • A main clubhouse with check-in, showers/restrooms, a self-serve kitchen and BBQ patio, and a storm safe room

  • Private massage cabanas, pickleball, POP tennis, and beach volleyball courts

  • A 10-foot privacy fence around the entire resort

To keep bills low and profits high, we only stay open 8 months a year (March 1 – October 31). We close completely for the 4 winter months, which cuts winter heating and staff costs down to almost zero.

The Numbers & How Your Money Is Safe:
You don't put all your money at risk on day one. Your cash goes in step by step, and we will lock in a fixed-price contract with a licensed builder before construction starts.

  • Land Price: $90,000

  • Total Cost (Land + Build): $1,077,300

  • Bank Construction Loan (65%): $700,245

  • Cash Needed from You (35% Down): $376,155 (plus my $900 = $377,055 total down)

  • Your Ownership Share: 90%

  • Expected Yearly Profit (Minimum): $125,949 / year

  • Your Yearly Payout (90%): $113,354 / year

  • Expected Return: 30.13% a year (You make your cash back in about 3.3 seasons, plus we plan to refinance in Year 3 to return 100% of your $376,155 while you keep your 90% ownership)

Step-by-Step Money Protection:

  • Step 1 (Days 1–60 Checks): Only $7,500 is spent on soil tests, survey, well filing, and county checks. Your remaining $368,655 stays safe in escrow.

  • Step 2 (Days 61–150 County Permits): Once Step 1 passes and we both agree to move forward, $10,592 goes toward county permit fees. That makes your maximum risk before closing $18,092, while $358,063 stays untouched in escrow until permits are approved and we close on the land.

Your Role vs. My Role:

  • You: Provide the cash ($376,155 released in steps) and the credit score to qualify for the $700,245 construction loan.

  • Me: Handle all the legwork—getting county permits, setting up the well and septic, managing the builder, hiring staff, and running the resort.

I have a full 7-section Investment Summary ready to share. Send me a direct message with your email address and I’ll send it right over.

1Reply
277 views

15 Replies

Jump to latestLatest
  • Lender · Philadelphia, PA · Member since 2024 · 75 posts · 19 votes
    4d

    A land and build project like that takes careful planning from the start. We arrange construction financing through Royal Partners and can guide you through the options for the next stage. We have several other options available as well. If you need further help, DM us or email us more details at [email protected].

  • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
    4d

    Thanks for reaching out. Right now, I’m focused on finding my cash partner before I shop around for the construction loan.

    Once I lock in my partner, I’d be happy to look at your loan rates and terms alongside our local bank options. Feel free to send over a basic summary of your construction loan requirements if you have one.

  • Lender · Peoria, AZ · Member since 2026 · 91 posts · 20 votes
    4d

    Hey Adrian,

    Interesting project. On the construction loan piece, I'd try to get a construction lender to look at the plan during your 60 day inspection window, not after a partner is in. That 65% number drives your whole partner ask, so knowing what a lender actually wants to see for a seasonal resort on a special use permit could change the cash needed quite a bit.

    I'm a mortgage broker licensed in Arizona, California, Colorado, Kansas, Texas, and Arkansas, and I like helping investors. Happy to be a resource. No pressure at all!

    Has a construction lender looked at the numbers yet? And are you picturing the year 3 refi as a commercial loan?

  • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
    4d

    Thanks for the insight - that makes a lot of sense, and having a lender look at the numbers during our 60-day inspection window is definitely part of the plan.

    To answer your questions: a construction lender hasn't reviewed the numbers yet (65% is just my starting estimate), and yes, I'm picturing the Year 3 refinance as a standard commercial loan once we have two full seasons of income to show.

    Since you're licensed in Colorado, what loan percentage do you usually see lenders offer right now for ground-up outdoor recreation or hospitality builds on a Special Use Permit?

    • Member since 2025 · 4 posts · 1 vote
      4d

      Adrian, I’d work backward from January 15 and put the survey, soil tests, well paperwork, and county checks on one schedule. Which of those has the longest lead time right now?

    • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
      4d

      Right now, the county checks and the land survey take the longest, especially with the holidays slowing everything down. The county told me I'll need a special use permit, and while I won't get full approval before January 15, I am setting up the initial meeting with them soon to make sure there are no deal-breakers. As for the crews, a 39-acre land survey takes about 3 to 5 weeks and soil testing takes 2 to 3 weeks, so I am booking those right away. The good news is the well paperwork is already mostly sorted out. I checked with the state water office and confirmed the existing well is in good standing and qualifies for a small commercial permit.

  • Lender · Peoria, AZ · Member since 2026 · 91 posts · 20 votes
    4d

    Hey Adrian,

    Honestly I can't give you a number on that one. Ground-up hospitality on a special use permit is commercial construction, which is outside the residential and investor loans I work on every day, and that percentage really depends on the lender and the project. I'd rather not guess and have you build your partner ask around it.

    Your best bet is to have a couple of local banks or commercial construction lenders look at your summary during the inspection window and tell you what loan to cost they'd do. That answer pretty much sets how much cash you need to raise. Good luck with it!

    • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
      4d

      That makes sense. I'll reach out to a few local commercial lenders and community banks here in Colorado during the inspection window to nail down the exact Loan-to-Cost numbers before finalizing the partner raise. Thanks again for taking a look.

  • Lender · Houston, TX · Member since 2026 · 154 posts · 44 votes
    4d

    Adrian, you’ve laid out the land, diligence period and construction budget clearly. Because the plan assumes a $700,245 construction loan and also relies on a partner’s credit, I would separate the equity discussion from the construction-debt underwriting. A lender will likely want to validate the entitlement path, special-use approval, well and septic documentation, builder contract, contingency, borrower liquidity, guarantor structure and support for the operating projections before sizing the loan. I’m Nyisha with EquityNest Capital. I’m not offering an opinion on the projected return, but I’d be glad to review the debt side of the capital stack and identify the documents a construction lender would likely request. No pressure.

    • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
      4d

      Hey Nyisha, thanks for breaking all that down. Splitting up the investor side from the loan side makes total sense. I hadn't really looked at them as two separate things yet. Right now I'm just focused on knocking out the county checks, water paperwork, and builder quotes during my inspection window. Appreciate the insight.

  • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
    3d

    Quick update: Earnest money is officially deposited with Land Title, my LLC is active, and I just sent out quote requests to local El Paso County surveyors, septic engineers, and commercial lenders to nail down hard Loan-to-Cost numbers during the 60-day inspection window.

  • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
    2d

    Quick update on pre-closing progress for anyone reviewing the numbers:

    • Direct-to-SUP County Track Confirmed: El Paso County Planning confirmed in writing today that a formal Early Assistance meeting is optional, allowing us to skip straight to the Special Use Permit (SUP) + Site Development Plan filing post-closing.

    • Firm Septic & Soil Quotes Locked: Colorado Geo-Solutions confirmed pricing ($900 soil test / $600 excavation; $3,000–$4,000 engineered OWTS design) with field scheduling open right after Thanksgiving.

    • Commercial Construction Debt Guidelines: Confirmed local commercial banking terms (60%–65% LTC / 55%–60% LTV post-SUP approval), with the $90,000 cash land closing (~$2,286/acre vs. $3,800–$5,500+/acre Calhan A-35 comps) sequenced ahead of vertical construction financing.

    • Updated Stress-Tested Underwriting: Added three build/payroll stress-test tiers modeling ~30% (Lean), ~21% (Mid-Range), and ~13% (Turnkey Commercial) investor cash-on-cash returns.

  • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
    1d

    Friday Update (Nov 20): Three new items locked in today:

    • Title Commitment Issued: Received the Title Commitment from our title company today; recorded exceptions are in review.

    • Foundation Soil Boring Quote Secured: Added a local geotechnical firm's quote for the stamped foundation soil report ($2,250, ~3-week turnaround, open right after Thanksgiving) alongside yesterday's septic profile pit quote.

    • Streamlined Two-Phase Budget: Trimmed non-essential site specs (moving to a permit-exempt 7-ft privacy fence and Class 6 road base parking) while adding $45,000 in civil engineering and loan closing reserves—bringing Case 1 total capitalization to $1,000,300 ($349,205 net investor equity; ~33.5% projected CoC on a 90/10 split + 8% preferred return). Phase 1 caps pre-closing due diligence at $10,750 through January 15 before closing debt-free on the $90,000 land; Phase 2 covers the SUP/SDP filing and construction loan draw.

  • Derek PattersonPro Member
    Developer · NV · Member since 2026 · 26 posts · 3 votes
    1d

    Adrian, nice work locking the 39 acres with a long inspection window; that's real leverage. One thing worth working through before you finalize the stack: the 65% construction loan assumption is where deals like this usually get re-cut. A local bank looking at a first ground-up project will lean hard on the guarantor's personal balance sheet and liquidity, and an LLC with no bureau file, no banking history and no reporting accounts gives them nothing else to underwrite. Developers who scale tend to separate two things: the operating entity's own credit capacity (its own D&B, Experian and Equifax business files, banking and reporting history) and each project's single-purpose entity, so the next project isn't hostage to one guarantor. I'd also get a construction lender's sizing in writing before you size investor equity, since a lower loan-to-cost changes your partner math a lot. Happy to share how I set this up for clients if it's useful.

    • Developer · Colorado Springs · Member since 2026 · 16 posts · 2 votes
      23h

      Thanks for the input. I’ve already spoken with local commercial lenders here in Colorado Springs, and you're right—for a ground-up special-use project, banks require strong personal guarantees, approved site plans, and cap out around 55–65% LTC.

      That's why I'm focusing on bringing in a balance-sheet JV partner or funding Phase 1 (starting with the $90K land purchase and $2.5K soil/septic testing) through private equity so we don't rely on bank construction financing early on.

Join the conversationCreate a free account to reply, vote on answers and follow this thread.