23 January 2026 | 39 replies
At the time, I was very green to hiring contractors, and the entire electrical wire was done without permits.
29 January 2026 | 3 replies
I'm not a lawyer and don't know your local laws but:Why do you need the Tenant to turn on the power to the RV?
18 January 2026 | 2 replies
The reason was simple: AI, data centers, and advanced manufacturing are consuming power faster than the grid can support, and waiting years for traditional permitting and financing timelines isn’t an option.That’s an important shift.
3 February 2026 | 0 replies
It needs power, cooling, redundancy, water, and constant upkeep.
20 January 2026 | 10 replies
The wiggle room you get sourcing this way is a super power.
20 January 2026 | 7 replies
The electrical wiring is knob and wire living rooms do not have lighting.
17 January 2026 | 3 replies
Toledo Edison is our power provider and they are very difficult to work with.
21 January 2026 | 3 replies
.🏭 Industrial Asset Examples:Heavy & General Industrial FacilitiesManufacturing plants with production lines, cranes, and heavy power requirementsDistribution hubs serving regional or national supply chainsCold storage or food-grade industrial facilitiesIndustrial campuses with multiple buildings and shared infrastructureRail-served or port-adjacent industrial propertiesValue Creation Examples:Reconfiguring floor layouts for production efficiencyPower upgrades (3-phase, heavy amperage)Dock door additions or conversionsYard expansion and truck circulation improvements🏗 Flex Property Examples:Hybrid Office / Industrial AssetsFlex parks with front-office showroom and rear warehouse spaceTech-enabled flex buildings for R&D or engineering firmsContractor flex spaces (plumbing, HVAC, electrical firms)Medical or lab-adjacent flex facilities:Business parks with divisible flex suitesValue Creation Examples:Converting excess office to warehouse or vice versaImproving curb appeal for higher-quality tenantsRepositioning flex from owner-user to investment productUpgrading loading access or clear heights⚙️ Light Manufacturing Examples:Low-Impact Manufacturing & AssemblyAssembly plants (electronics, medical devices, packaging)Food processing or bottling facilitiesPrinting, plastics, or fabrication shopsApparel or product assembly centersSmall-batch production facilitiesValue Creation Examples:Layout optimization for workflow efficiencyUtility coordination (gas, water, compressed air)Compliance upgrades (ADA, OSHA, food-grade finishes)Expansion planning for future growth🚚 Warehouse & Distribution Examples:Storage & Logistics FacilitiesLast-mile delivery warehousesRegional distribution centersE-commerce fulfillment facilitiesBulk storage and racked warehousesMulti-tenant warehouse parksValue Creation Examples:Dock-high vs grade-level conversionsClear height increases or racking optimizationTruck court and trailer storage improvementsLighting, flooring, and fire suppression upgrades🏢 Business Center / Multi-Tenant Industrial Examples:Small-bay industrial parksContractor and service-oriented industrial centersMixed flex-industrial business campusesOwner-user industrial condo developmentsValue Creation Examples:Tenant mix optimizationOperating expense reduction through vendor renegotiationCapital improvement planning tied to lease renewalsRepositioning older assets to modern industrial standards
11 January 2026 | 4 replies
Automation, robotics, cold storage, and 24/7 logistics all require large and reliable electrical capacity.
28 January 2026 | 8 replies
This is something I always stress and make very clear:
STR investing is not just buying a property and listing it on a platform for rent.
A short-term rental is essentially a hospitality asset.
It’s not a hotel or ...