California Just Changed the ADU Game

California Just Changed the ADU Game

Benn MartensonBusiness Member
Real Estate Agent · Ventura, CA · Member since 2026 · 24 posts · 10 votes

If you're investing in California, there's a new law you should know about.

California just passed AB 956, signed into law September 29, 2026, and effective January 1, 2027. It significantly expands what property owners can potentially build on qualifying single-family residential lots.

Here's why I think this could be particularly interesting for investors.

The new law requires local governments to approve TWO detached ADUs on qualifying single-family lots, rather than the previous one-unit allowance.

In practical terms, a qualifying property could potentially have:

  • One existing or proposed primary residence.

  • A first detached ADU.

  • A second detached ADU.

That's potentially three residential units on a property that investors might previously have evaluated as a single-family home with one ADU opportunity.

Now I have to look at my market Ventura specifically.

We have a unique land-use situation. The SOAR initiative restricts outward urban expansion and protects surrounding agricultural land and open space. We don't have unlimited land to keep expanding into.

That makes the question of how we use existing residential properties increasingly interesting.

I think investors should start looking at real estate differently.

Instead of evaluating a property strictly on its existing rental income, consider its potential future development.

Imagine purchasing a single-family home with a lot that can accommodate two additional detached units. Depending on acquisition cost, construction expenses, permitting, and achievable rents, that could create an entirely different investment opportunity.

There is another piece worth mentioning.

California also passed SB 1117, which changes the calculation of certain ADU impact fees. For up to two ADUs on a lot, qualifying units larger than 750 square feet generally have impact fees calculated only on the square footage exceeding 750 square feet. This could further improve project economics.

A few important considerations:

  • The property must qualify under the applicable state requirements.

  • The law does not guarantee approval of every proposed design.

  • Each detached ADU is generally subject to an 800-square-foot maximum under this particular ministerial approval provision, along with applicable height and setback requirements.

  • Coastal restrictions, utilities, fire access, lot configuration, construction costs, and other property-specific conditions still matter.

  • Actual rental income and return on investment need to be independently evaluated.

For us here in Ventura, we are geographically constrained. Housing demand isn't going away, and California just expanded the development opportunities available to qualifying property owners. I think properties with the physical and legal potential to accommodate multiple units could become increasingly interesting acquisition targets.

If I were looking at investment properties in Ventura today, I'd be paying much closer attention to lot dimensions, zoning, existing structures, and ADU potential.

I'd love to hear from other investors:

  1. Would you pay a premium for a property with the potential to accommodate two detached ADUs?

  2. Do you think this will change single-family investment valuations?

  3. Are you already underwriting ADU potential into your acquisitions?

I think this could be a significant shift in how we evaluate residential investment properties.

1Reply
12,594 views

1 Reply

Jump to latestLatest
  • Investor · Remotely · Member since 2026 · 31 posts · 17 votes
    2w

    Thanks for laying out the details, Benn. Before paying a premium for ADU potential, I'd underwrite it the way I'd run comps on a flip. Comp the finished units, meaning rents for detached units around 800 square feet in the same neighborhood, and then subtract your real build cost, fees, and vacancy during construction. I'd screen the lot first with a short checklist covering lot size, setbacks, utility access, fire access, and whether the owner's mailing address shows they live out of the area. Then confirm the final rules with the city planning department before you make an offer, since each parcel can come out differently.

    Are you running your ADU numbers on a few test properties yet?

Join the conversationCreate a free account to reply, vote on answers and follow this thread.