Owned free and clear, rehab already underway—how did you fund the next phase?
Hi everyone,
I could use some practical advice from anyone who has been in this position.
I inherited a mixed-use building across from the Piscataquis River in Howland, Maine, and own it free and clear. I’ve invested over $30,000 in engineering, demolition, cleanup, shoring, bracing, moisture protection and electrical service. Construction fencing is also in place.
My insured GC has quoted $150,000 ARV is approx $305k, based on low end of comparable comps. As is 75k just sitting, per tax assessment Pending appraisal. The engineer's next set of rehabilitation plans is $5,000. My plan is two storefronts and an upstairs apartment, then leasing and refinancing. Footprint for future expansion already in place with confirmed no additional permits would be needed, because of the recent demo of it.
This is my first rehab myself but I have second hand experience and my GC and engineer both have many years of experience in the fields they are in. I've been employed with the same NYS employer for over 20 years.I believe I bring budget coordination and reconciliation, scheduling, attention to detail and invoice tracking to the table. I have steady income and the ability to be on site often. My credit needs improvement, and I can document emergency reserves, but I can't front each construction phase while waiting for reimbursement. Initial funds would include engineering plans to start the next structural phase. Direct payments to my engineer, contractor and suppliers are fine, doesn't need to be direct to me. My GC can carry some labor. I figure a possible initial draw of $33k which is 44% of the as is to get my next phase done. The rest can be held and disbursed in draws based on the completed work. I have done substantial work already and major changes in the town, have me getting pressure to get it done quickly, as it's the first thing you see when you enter the town circle, and right across from the ARV trails and river. I have town backing and a structural engineer who, already walked the property with town inspectors to ensure safety. All is cleared to go. Took care of inspections and permits. GC and Engineer are waiting. I need the funding asap. Looking possible hard money route for time. For exit plan, I have multiple cosignors if needed and if dscr or conventional methods fail then sale will be my exit to pay loan. What are my options to get this done? Any questions for me?
For those who have actually done something similar:
What loan structure allowed funding for materials and mobilization at closing?
Was documented work you had already paid for recognized for reimbursement ?
How did you arrange later draws so the crew could keep working?
I have photos, receipts and an itemized scope ready. I’m looking for advice on the right financing approach, especially from people familiar with rural mixed-use rehabs. What worked for you?
0 votes total