Won the auction bid. Came down to our last $100 of bid limit. Max'd out at $9,000 per acre on the 75 acres. The other person bowed out at $8,900. Lucky us. Made the 10% day of sale payment via
Made it back from Italy. Ate my way thru Italy, trying as many dishes as possible. Sometimes ordered two dinner plates. Only gained 2 pounds, which is great. Already lost it, so even better.
Have two days to catch up, then off to Belize for our Teak Plantation. Need to clear brush and plant about 10,000 trees. So, if you have a post and I don't answer, I will catch up in about two weeks.
Road Entrances:
How many lots we get on these 75 acres is dependent on the number and types of driveway entrances we get approved. This subdivision is in the county and not the city. Met with the County supervisor who is in charge of road entrances. This will predetermine this project financial success.
Types of drives:
1. Private Drive- County does not maintain. Have to get definition and building stipulations tomorrow from the County Engineer.
2. Single drive
3. Shared Drive- can have up to two or maybe three. They normally don't approve 4 or more. The shared drive concepts becomes important as you understand the "Line of Sight" discussion below.
4. Concrete road with Cul De Sac at the end. If you do a concrete road into the property, then they will allow you to spin off many roads internally off this road the single driveway access. This becomes a cost/payback issue. For example, say a 200 foot road with a Cul De Sac costs $100,000. Then you need to at least sale one more lot for $100,000 to break even.
All county properties have to have their own legal access; or a concrete Cul De Sac to access the property. You can't segregate a lot that requires a Legal Easement across another property.
Line of Sight:
This property is a rectangle and has roads on two sides. A Major and a minor.
Minor collector- 55 mph, 610 feet line of sight each way, 300 feet between road entrances, 100 feet away from cross roads.
Local- 35 mph, 300 feet line of sight each way, 300 feet between road entrances, 100 feet away from cross roads.
Grandfathered- Since this is zoned agriculture all existing entrances into fields are grandfathered in. You can ask to have them moved.
The problem with this property is the long side of the rectangle basically two 40 acre sites back to back or 1/2 mile long on the back side, getting access to it. Also, we will have the issues of Electric and internet fiber optics back there; along with road cost. Normally the buyer would have to foot these costs, but this will put most buyers off investing a quarter mile in road, electric, fiber optics before even building.
Met with the County manager to go over entrances. You will probably ask why I am spending so much of this post on the Drive way Entrances. Again, the entrances and types in this country setting or rock roads will determine the number of lots we can do, and the financial success of the overall project.
Entrance 1- Accesses the long 1/2 mile back side of the property. Existing farm entrance grandfathered in. Roadway is 23 feet wide thus fine on width. The tube or culvert is in good shape. In our county you pay for the first culvert or tube, after that if they need replaced, the county pays. Can only put one entrance here. Of the original 80 acres, 5 acres was segregated for a farmhouse. We are less than 300 feet away from it, and rules say there must be 300 feet between driveways. Here we can access for a Shared drive for 3 house lots. Problem is we want 5 or 6 lots on this side which is across the creek from the other road side.
Entrance 2- Existing farm access road is at the extreme edge of the field, making subdivision hard. He will allow me to move the entrance to 100 feet minimum from the road intersection. This will allow us to do a Share drive for 2 or 3 lots. This will require us buying a Culvert and paying for it to be installed. Depending on the size of the culverts they may cost $1,500 up to $5,000 to both purchase the culvert and have it installed, dirt added and compacted.
The next entrances are along the long side of the rectangle on the Major road.
Entrance 3- This would be a new field entrance. It is both 100 feet or more from the intersection. Also has 610 feet line of sight both ways. This will be easy to approve.
Entrance 4- Entrance 3 and 4 are separated by a ditch. Entrance 4 is on the extreme edge of this next piece of property. Keep in mind there is a big ditch in the middle and large ditches along this road. This entrance is grandfathered in as an agricultural entrance but is too far to the edge to help divide this location into lots. In the middle of this lot is a large hill on my side where they cut through a hill. Will bulldoze down the hill. Ask the county to allow me to move this driveway entrance to there. We will then have 610 of line of sight since we are on top the road crest and be over 300 feet away from any other driveways. Will go for a Shared driveway for 3 lots.

Entrance 5 and 6- The grandfathered farm entrance is close to the crest of the hill. Due to the road having a crest, down both sides you can't get 600 feet of Line of sight. Proposed asking the county to lower this road crest to flatten out the road for line of sight. Then I will ask for two entrances, both of which will be shared entrances. Entrance 6 will shoot straight to the back to a dam across the big ditch, to access the backside of the long 1/2 mile backside to help create two lots back there.

Some of the entrances are easily approved or we will use existing farm entrances. Others will require approval.
A. I fill out Entrance applications.
B. County Engineer approves or denies.
C. I file a Variance if it was originally denied.
D. County Board of Supervisors approve or deny.
Sorry couldn't get the below forms flipped.


Now I fill out these forms for each entrance. They get approved or denied by the County road manager.
Then I ask for a waiver if denied from the County Board of Supervisors.
Then I get a cost estimate and see how much this dirt work will cost and if it makes financial sense. If it doesn't, then I come up with a different game plan.