Pre-Fab homes should not be any more difficult to finance than regular stick-built provided it meets the same requirements. This is not to be confused with "manufactured/mobile homes", those are a different animal. The thing you will need to look out for with pre-fab is the draw/payment schedule from your pre-fab company. Typically they require an initial deposit and then subsequent payments along the way, and most construction loans only disburse when the items are on-site/installed. So you could end up with a cash flow issue, where you need to advance funds to keep the pre-fab process going before you can submit a draw request to get reimbursed from the construction loan.

See this reply in the discussion

7 Replies

Jump to latestLatest
  • Contractor · Scottsdale, AZ · Member since 2010 · 2k+ posts · 3k+ votes
    2y

    Great idea in concept but you nailed it... biggest challenges are going to be zoning and utilities. Also financing. It'll be more challenging to find a lender to finance this type of a development deal.

    I've looked into it a good bit and I dream of one day building a prefab home in the forest as a vacation home / possible short term rental. But I don't think it's a viable business plan.

    Btw once you start pricing these things out you'll realize that a lot of the time, you'll pay more per square foot for a prefab home compared to a site built home.

  • Member since 2023 · 20 posts · 6 votes
    2y

    This would be an all cash buy with my own capital. But I hear you on time. Still think it could be cheaper than an extensive rehab and the time it takes to find a good BRRRR deal may offset the time.

  • Adam WindhamPro Member
    Lender · San Diego | Phoenix | Miami · Member since 2019 · 39 posts · 65 votes
    2y

    Pre-Fab homes should not be any more difficult to finance than regular stick-built provided it meets the same requirements. This is not to be confused with "manufactured/mobile homes", those are a different animal. The thing you will need to look out for with pre-fab is the draw/payment schedule from your pre-fab company. Typically they require an initial deposit and then subsequent payments along the way, and most construction loans only disburse when the items are on-site/installed. So you could end up with a cash flow issue, where you need to advance funds to keep the pre-fab process going before you can submit a draw request to get reimbursed from the construction loan.

  • Adam WindhamPro Member
    Lender · San Diego | Phoenix | Miami · Member since 2019 · 39 posts · 65 votes
    2y

    Pre-Fab homes should not be any more difficult to finance than regular stick-built provided it meets the same requirements. This is not to be confused with "manufactured/mobile homes", those are a different animal. The thing you will need to look out for with pre-fab is the draw/payment schedule from your pre-fab company. Typically they require an initial deposit and then subsequent payments along the way, and most construction loans only disburse when the items are on-site/installed. So you could end up with a cash flow issue, where you need to advance funds to keep the pre-fab process going before you can submit a draw request to get reimbursed from the construction loan.

  • Member since 2023 · 20 posts · 6 votes
    2y

    I wouldn’t be getting any financing or lending. I would be paying all cash 

  • Member since 2019 · 7k+ posts · 4k+ votes
    2y

    i am thinking of doing this and on the discussion with the builder since they said they can take care permit. i may think to build one in industrial zone/MF with large lot within the city. On paper it seems straightforward.

    I would then just use solar and fence it out. It seems it could breakeven within 2-3 years with cash.

    Let me know how you progress ;-) fun times ... 

    my exit strategy if thing doesnt work, they can take over the unit LOL and I would lose money in improvement/etc.

  • Member since 2019 · 7k+ posts · 4k+ votes
    2y
    Quote from @Scott E.:

    Great idea in concept but you nailed it... biggest challenges are going to be zoning and utilities. Also financing. It'll be more challenging to find a lender to finance this type of a development deal.

    I've looked into it a good bit and I dream of one day building a prefab home in the forest as a vacation home / possible short term rental. But I don't think it's a viable business plan.

    Btw once you start pricing these things out you'll realize that a lot of the time, you'll pay more per square foot for a prefab home compared to a site built home.

    There's folk doing this in Santa Cruz Mountain, quite beautiful. But whether it's profitable or not I don't know.