What I ask a contractor before I hand them the keys to a vacant unit

What I ask a contractor before I hand them the keys to a vacant unit

Investor · Member since 2026 · 121 posts · 26 votes

A vacant unit feels low-risk. Nobody's living there, nothing can be disturbed, just go in and do the work. That's exactly why it's the place where things go sideways — nobody watching, nobody to notice the thermostat left at 85, the water left on, or the back door that didn't latch.

Before I hand keys to anyone now, I ask five questions. They take three minutes, and they have saved me more than any clause I've ever added to a scope letter.

1. "Who exactly will be in the unit?" Not the company — the people. I want names, or at least a count and a lead. If the answer is "whoever's free that day," I don't hand over keys until there's a named lead.

2. "What time will you be there, and when will you leave?" Vacant units attract attention. A truck at 10 p.m. is a neighbor calling the police, or worse, someone assuming the place is open. Work hours go in writing, even for a one-day job.

3. "What are you turning on, and who turns it off?" Water, gas, power. The rule is: the person who turns it on is the person who turns it off, and they confirm it by text with a photo. I learned this one from a water heater that ran for a weekend.

4. "How do you lock up?" Deadbolt, not just the knob. Windows latched. Garage remote left inside, not in a truck. And the lockbox code changes after the job — every time, no exceptions.

5. "What do you do if you find something else wrong?" The leak behind the wall, the outlet that sparks, the thing that isn't in the scope. I want to hear "I stop and call you" before the job starts, not after they've fixed it their way and billed me for it.

Then one habit on my side: I walk the unit the same day the work finishes, before the next person gets keys. Photos of every room, the thermostat, the water heater, the locks. Five minutes, and I know exactly what state the place was left in.

The contractors who answer these questions well are almost always the ones who do the work well. The ones who bristle at being asked are telling you something too.

What do you ask before you hand over keys — and what did you learn the hard way?

0Reply
118 views

6 Replies

Jump to latestLatest
  • Member since 2018 · 34 posts · 4 votes
    13h

    This is a great checklist — I'd add one more question up front: are you licensed and insured for this specific work, and can you send proof before you start? I also ask for a quick photo text when they arrive and when they lock up, so I have a timestamped record if anything is left on or unlocked. Changing the lockbox code after every job, not just after a turnover, has saved me more than once. That's one reason I like how TCS Property Management runs turnovers — they keep that access log and same-day walkthrough tight, so a vacant unit doesn't sit in an unknown state between vendors.

  • Member since 2023 · 229 posts · 104 votes
    11h

    Good list. The one thing I would add is timing: do not meet a contractor for the first time on a vacant house with a clock running. We find and test contractors months before something breaks, starting with small paid jobs — a faucet, a patch, a lock change — so we know how they show up, how they communicate, and whether the work holds. By the time they get a full turnover, that part is already settled. It matters because a turnover that drags is what really costs you. We run rent-ready turns on a 21-day schedule, and turnover and vacancy cost more than repairs, so a cheap bid from someone untested is the expensive choice. I would also get the scope, the price, and who buys materials in writing before the keys change hands, with photos at the start and at the end.

  • Rod HanksBusiness Member
    Insurance Agent · Dallas, TX · Member since 2013 · 753 posts · 467 votes
    9h

    I'd add one more: get a certificate of insurance showing their general liability and workers comp before they start, not just a photo of a card. If their guy gets hurt or they flood the unit and they don't have coverage, it lands on your policy. Also worth checking your own vacancy terms if the unit's been empty a while.

    Rod Hanks Insurance4.9168 Reviews
  • Leo SteinBusiness Member
    Property Manager · Orange County, CA · Member since 2025 · 392 posts · 91 votes
    8h

    Great list, Willson. The photo-by-text confirmation when water or power goes back off is a habit worth copying. I'd add a timestamped photo walkthrough of the unit before and after the job, so any damage question later has a clear answer.

    Real Property Management Optimal 4.926 Reviews
  • Las Vegas, NV · Member since 2018 · 52 posts · 27 votes
    5h

    Good list. On our short-term rentals the lockbox is gone, and that changed how I handle number 4. Every vendor gets their own smart lock code that only works for the job window, then it expires on its own. I don't have to remember to change anything, and the lock's log tells me exactly when they came and went. If a code gets used at 10 p.m., I know about it the next morning, not a month later.

    The one I'd add for this time of year is the thermostat on the way out. In a vacant unit in winter I want the heat set to a floor, around 55, not off, and a photo of the thermostat in the lock-up text. A contractor who turns the heat off to save you money can cost you a burst pipe.

    I also ask who else will get the code. Subs hand codes to their helpers, so the code is for the named lead only, and if someone else needs in, they ask me first.

  • Investor · NY · Member since 2026 · 21 posts · 0 votes
    4h

    Good list. As a GC I'd add a sixth: how will you show me the work is done before you leave? I ask for photos from inside the unit before they lock up: the finished work, the thermostat setting, the water heater and the locked doors. Same angles every time so I can compare. On a vacant unit nobody is going to tell you the crew left a back window open or the heat on 55. Photos taken on site that day catch it while they can still drive back. It also settles the "we finished Tuesday" argument when the invoice shows up.