Real Estate Broker · Miami, Miami-Dade County · Member since 2023 · 3 posts · 3 votes
Most deals stall because the money and the contract live in two different places. The seller waits on a buyer, the buyer waits on a lender, and the file ages in between.
From the broker's desk, the fix is structural: bundle them. An assignable purchase contract, plus the loan package sized on the exit math — the same all-in cost sheet, payoff and reserves picture this forum has been picking apart all week — presented as one closing package.
For the buyer, the deal and its financing arrive together. For the seller, it's cash, as-is, taxes settled at closing. For the lender, the file shows up already computed instead of half-built.
Question for the lenders and buyers here: when a wholesaler brings you a deal, does having the financing package attached help — or get in the way?
— Henry, ALL VIBRATIONS RISE LLC · Florida loan broker (not a direct lender)
Helps, as long as the numbers are real. A package that shows the all-in cost, payoff and reserves up front saves a lender a full round of back and forth.
The tradeoff is trust, if the loan piece is sized on rosy exit math the whole file loses credibillity fast. One clean sheet with conservative numbers beats three optimistic ones.
I'm a broker in Sacramento managing 100+ Airbnb properties, and I see the same thing on the buy side. Hope this helps
It helps when the file is verifiable and gets in the way when it's built on the wholesaler's numbers. Most DSCR lenders order their own appraisal and size the loan off their own value and rent figures, so an attached cost sheet usually gets rebuilt anyway. What saves days is anything a lender can check fast: the signed contract, a lease or rent comp, entity documents and proof of funds. Tying one specific loan to an assignable contract can also box in the end buyer, whose credit and reserves may fit a different program better. Closing the gap between money and contract is a sound instinct, since files do age while people wait on each other. Which items in your packages have lenders actually reused instead of redoing?