How do you analyze commercial development deals?

How do you analyze commercial development deals?

Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes

I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

A few things I’m especially curious about:

What metrics do you focus on most for development deals?

How do you model lease-up risk or slower-than-expected absorption?

Do you build your own spreadsheets or use specific tools?

Any mistakes you made early on that changed how you analyze these deals?

Would love to hear how people here structure their analysis before moving forward on a project.

2Reply
580 views

Most Popular Reply

Member since 2021 · 86 posts · 79 votes
8mo

How to Underwrite Commercial Development Deals: The Metrics, Models, and Mistakes That Actually Matter

If you've been analyzing rental properties and small commercial deals, scaling up to ground-up development can feel like learning a new language. Here's the framework I use to underwrite commercial development projects — and the expensive lessons that built it.

Making the jump from analyzing stabilized rental properties to underwriting commercial development deals is one of the biggest leaps in real estate investing. The core principles are the same — buy right, manage risk, create value — but the modeling gets dramatically more complex.

With a rental property, you're analyzing what already exists. With development, you're projecting what might exist 18-24 months from now, betting your capital on assumptions about construction costs, tenant demand, and market conditions that haven't materialized yet.

I've underwritten deals ranging from small mixed-use buildings to large-scale commercial projects, and I've learned that the difference between a profitable development and a disaster usually comes down to how honestly you modeled the unknowns before you broke ground.

Here's the framework I use today — and the mistakes that forced me to build it.

The Five Metrics That Drive Every Development Decision

When you're analyzing a stabilized property, cap rate and cash-on-cash return tell most of the story. Development deals require a different toolkit. These are the five numbers I look at before anything else.

1. Development Yield (Yield on Cost)

This is THE metric for development deals. It's your projected stabilized Net Operating Income divided by your total development cost.

Why it matters: Development yield tells you whether you're actually creating value or just taking construction risk for returns you could get buying an existing building. The magic number is the spread between your development yield and the market cap rate for comparable stabilized properties.

The rule: If your development yield doesn't exceed the market cap rate by at least 150 basis points, the deal doesn't justify the risk.

Example: Stabilized office buildings in your market trade at a 7% cap rate. Your total development cost is $3 million, and your projected stabilized NOI is $270,000. That's a 9% development yield — a 200 basis point spread over market. That's a deal worth pursuing. If that same project only generates $230,000 in NOI (7.7% yield), the 70 basis point spread doesn't compensate you for 18 months of construction risk, lease-up uncertainty, and capital tied up earning nothing.

2. Total Development Cost Per Square Foot

This is where most first-time developers get surprised. Total development cost isn't just what the contractor charges you — it's everything.

Break it into three buckets:

  • Hard costs: Actual construction — foundation, framing, mechanical, electrical, plumbing, finishes. This is the number your contractor bids.
  • Soft costs: Architecture, engineering, permits, legal, accounting, lender fees, construction management, insurance, interest carry during construction. First-time developers routinely underestimate this by 40-50%.
  • Land: Acquisition cost plus any site work (grading, utilities, environmental remediation) needed before construction starts.

Benchmark carefully and locally. National averages are nearly useless for development budgeting. A Class A office building costs $250/SF in Nashville and $450/SF in San Francisco. Rural markets often run higher than you'd expect because material delivery and specialized subcontractor availability add cost. Always get local contractor bids before you finalize your model.

3. Breakeven Occupancy

What percentage of your building needs to be leased before rental income covers debt service plus operating expenses?

The rule: I want breakeven occupancy below 65%. If you need 80%+ occupancy just to keep the lights on and make your loan payment, you're one vacancy away from writing checks out of pocket every month. In smaller markets where tenant pools are limited, this metric is even more critical — losing a single tenant in a 10,000 SF building hits a lot harder than in a 100,000 SF building.

4. Cash-on-Cash Return at Stabilization

After the building is constructed, leased up, and operating at its projected occupancy — what's your annual cash return on the equity you actually invested?

The rule: For development risk, I want 12%+ cash-on-cash at stabilization. Anything below that and I should have just bought an existing building with immediate cash flow instead of tying up capital for two years with zero return during construction and lease-up.

5. Internal Rate of Return (IRR)

IRR captures what the other metrics miss: the time value of money across the entire project lifecycle. A project that generates a 9% annual return sounds decent until you realize your capital earned literally zero for 24 months during construction and lease-up, making the time-weighted return much less impressive.

The rule: Development deals should target 18-25% IRR over a 5-7 year hold (including construction, lease-up, stabilization, and exit). This compensates for the complexity, the risk, and the opportunity cost of capital sitting idle during construction.

How to Model Lease-Up Risk Without Lying to Yourself

Lease-up is where development deals go to die. It's also where the most dangerous optimism creeps into your model. I've seen developers model a 6-month lease-up for a 40,000 SF building in a market that absorbs 3,000 SF per month. The math doesn't work, but the spreadsheet doesn't argue with you.

Here's how I approach it honestly.

Build Three Scenarios — Not One

Base case: 10-15% of total leasable SF absorbed per month, starting 3 months after certificate of occupancy. This assumes your market is healthy, your building is well-positioned, and your broker is actively working the deal.

Downside case: 5-8% per month, starting 6 months after CO. This is what happens when the market softens, your asking rents are slightly too high, or tenants take longer to make decisions than you expected.

Disaster case: 3-5% per month, starting 9 months after CO. If your deal survives this scenario — meaning you can cover debt service from reserves without running out of cash — you have a resilient project.

The key question: Which scenario do you use as your base assumption? Most developers use the optimistic one. Experienced developers use the downside case as their base and treat the optimistic scenario as upside. Your lender will appreciate this approach, and so will your investors.

The Carrying Cost Trap

Every month your building sits partially vacant, you're bleeding cash. Debt service, insurance, property taxes, basic maintenance, property management — these costs don't wait for tenants to show up.

Model 18-24 months of carry costs as a line item in your total development budget. Not as a "contingency you probably won't need" — as a real budget line with real dollars allocated. This is the single item most likely to turn a profitable project into a capital call if you didn't plan for it.

Pre-Leasing Changes Everything

The single most de-risking thing you can do on a development deal is pre-lease space before you break ground. Getting Letters of Intent from tenants before construction starts does three things simultaneously:

  1. Validates your assumptions. If you can't get LOIs, the market is telling you something. Listen.
  2. Improves your financing. Lenders will offer better terms — often 50-100 basis points lower — when they see committed tenants.
  3. Compresses your lease-up timeline. Tenants who signed LOIs pre-construction typically take occupancy within 60-90 days of CO, meaning you start generating income almost immediately.

In smaller markets, pre-leasing isn't optional — it's survival. A market with 500,000 people has enough tenant churn that absorption happens organically. A market with 10,000-50,000 people doesn't have that luxury. You need to know your tenants by name before you pour the foundation.

Building Your Development Pro Forma

Most experienced developers build custom Excel models because every deal has enough unique variables that off-the-shelf software can't capture the nuances. Here's what your model needs to include.

The Six Essential Tabs

  1. Sources & Uses — Where every dollar comes from (senior debt, mezzanine debt, equity, grants, tax credits) and where it goes (land, hard costs, soft costs, reserves, financing costs). These two columns must balance. If they don't, your deal has a gap.
  2. Construction Draw Schedule — Month-by-month cash outflows during construction. Your construction lender funds draws based on completion milestones verified by a third-party inspector. Model the timing of draws carefully — you pay interest on funds drawn, not on the total commitment.
  3. Lease-Up Schedule — Month-by-month absorption across your three scenarios. Each new lease should flow into the operating pro forma automatically, building income gradually rather than assuming a magic day when the building goes from empty to full.
  4. Operating Pro Forma — Year-by-year income and expenses from CO through your exit. Include 3% annual rent growth (or whatever your market supports), realistic expense escalation (insurance and property taxes tend to grow faster than rents), and a capital reserves line for future maintenance.
  5. Cash Flow Waterfall — How cash gets distributed to stakeholders. Debt service gets paid first, then investor preferred returns, then promote splits. If you're raising outside equity, your investors will scrutinize this page more than any other.
  6. Sensitivity Analysis — This is the tab that separates amateurs from professionals. Build sensitivity tables showing how your key returns (IRR, cash-on-cash, equity multiple) change when you adjust critical variables: What happens if construction costs increase 10%? 20%? What if lease-up takes 6 months longer than projected? What if market rents come in 10-15% below your assumption? What if your exit cap rate is 100 basis points wider than projected? If your deal falls apart when any single variable moves by 15%, it's too fragile.

Software vs. Spreadsheets

ARGUS Developer is the industry standard for institutional-quality development modeling, but it runs around $5,000/year and has a steep learning curve. For most individual developers, a well-built Excel model is actually better because you understand every formula and assumption. Consider ARGUS when you're underwriting multiple large deals per year and need to present institutional-grade output to lenders and equity partners.

Don't Leave Government Money on the Table

If your project has any community benefit angle — job creation, blight removal, affordable housing component, infrastructure improvement — there's likely grant money available that most developers never pursue because the application process seems intimidating.

CDBG (Community Development Block Grants): If your project serves a low-to-moderate income area or creates jobs, these can cover infrastructure improvements — roads, utilities, parking, sidewalks — that would otherwise come out of your development budget. That's real money back in your pocket.

EDA (Economic Development Administration) Grants: For projects that bring employment to a community, EDA grants can cover 50-80% of infrastructure costs. They require matching funds but can be substantial.

State-Level Programs: Most states have economic development agencies with grants, low-interest loans, and tax incentive programs for commercial development in targeted areas. These vary widely by state but are almost always underutilized.

Opportunity Zones: If your parcel sits in a designated Opportunity Zone, investors in your deal can defer and reduce capital gains taxes, making your equity raise significantly easier and potentially cheaper.

The critical rule: Model your deal without the grant first. If the project only works because of grant funding, that's a red flag. Grants should make a good deal great — they shouldn't be the difference between profitability and loss. Grant timelines are also unpredictable, so your construction schedule needs to accommodate potential delays.

Five Mistakes That Rebuilt My Underwriting Process

1. I Underestimated Soft Costs by Half

On my first development deal, I budgeted 15% of hard costs for soft costs. Architecture, engineering, permits, legal review, lender fees, construction management, interest carry during construction, accounting — the real number was 28%. Now I budget 25-35% of hard costs for soft costs on every deal until I have enough completed projects in a specific market to refine that number with real data.

2. I Built What I Assumed the Market Wanted

Instead of asking the market what it actually needed. Before you finalize your project scope — before you hire an architect, before you apply for permits — talk to 20-30 potential tenants in your market. Ask what size spaces they need, what rent they can pay, what amenities matter. The number of times I've heard "we would have leased that space if only it had X" is painful. Let the market design your building.

3. I Relied on a Single Contractor Bid

Always get 3-5 competitive bids. Use a Guaranteed Maximum Price (GMP) contract with a shared savings clause — you and the contractor split any cost savings, which aligns incentives. Pure fixed-price contracts sound safe but often lead to aggressive change orders. GMP with shared savings gives the contractor motivation to find efficiencies while protecting your budget ceiling.

4. I Ignored the Time Value of My Capital

A deal that produces a 9% annual return sounds solid until you account for 24 months where your equity earned absolutely nothing during construction and lease-up. Simple return calculations hide this. IRR reveals it. I now calculate IRR on every development deal alongside static returns, and several deals that looked good on a napkin became clear passes once the time value of money was factored in.

5. I Modeled Only One Exit

I assumed I'd sell at a 7% cap in year five. What I didn't model: What if cap rates expanded to 8.5% by then? What if the market softened and I needed to hold for 10 years? What if I couldn't find a buyer at any price? Now I model three exit scenarios — optimistic, base, and downside — and the deal must still work in the downside case. If your returns evaporate when cap rates move 100 basis points, you don't have enough margin of safety.

The Bottom Line

Commercial development underwriting isn't about predicting the future — it's about stress-testing your assumptions until only the truth survives. The developers who consistently make money aren't smarter about market timing or construction management. They're more honest about what they don't know, and they build that honesty into every cell of their spreadsheet.

Model conservatively. Pre-lease aggressively. Stress-test relentlessly. And make every deal work on paper in your downside scenario before you put a shovel in the ground.

The upside in development is massive — creating value from nothing is the closest thing to magic in real estate. But the margin for error is thinner than any other strategy. Respect that, and the numbers will take care of themselves.

See this reply in the discussion

19 Replies

Jump to latestLatest
  • Member since 2021 · 86 posts · 79 votes
    8mo

    How to Underwrite Commercial Development Deals: The Metrics, Models, and Mistakes That Actually Matter

    If you've been analyzing rental properties and small commercial deals, scaling up to ground-up development can feel like learning a new language. Here's the framework I use to underwrite commercial development projects — and the expensive lessons that built it.

    Making the jump from analyzing stabilized rental properties to underwriting commercial development deals is one of the biggest leaps in real estate investing. The core principles are the same — buy right, manage risk, create value — but the modeling gets dramatically more complex.

    With a rental property, you're analyzing what already exists. With development, you're projecting what might exist 18-24 months from now, betting your capital on assumptions about construction costs, tenant demand, and market conditions that haven't materialized yet.

    I've underwritten deals ranging from small mixed-use buildings to large-scale commercial projects, and I've learned that the difference between a profitable development and a disaster usually comes down to how honestly you modeled the unknowns before you broke ground.

    Here's the framework I use today — and the mistakes that forced me to build it.

    The Five Metrics That Drive Every Development Decision

    When you're analyzing a stabilized property, cap rate and cash-on-cash return tell most of the story. Development deals require a different toolkit. These are the five numbers I look at before anything else.

    1. Development Yield (Yield on Cost)

    This is THE metric for development deals. It's your projected stabilized Net Operating Income divided by your total development cost.

    Why it matters: Development yield tells you whether you're actually creating value or just taking construction risk for returns you could get buying an existing building. The magic number is the spread between your development yield and the market cap rate for comparable stabilized properties.

    The rule: If your development yield doesn't exceed the market cap rate by at least 150 basis points, the deal doesn't justify the risk.

    Example: Stabilized office buildings in your market trade at a 7% cap rate. Your total development cost is $3 million, and your projected stabilized NOI is $270,000. That's a 9% development yield — a 200 basis point spread over market. That's a deal worth pursuing. If that same project only generates $230,000 in NOI (7.7% yield), the 70 basis point spread doesn't compensate you for 18 months of construction risk, lease-up uncertainty, and capital tied up earning nothing.

    2. Total Development Cost Per Square Foot

    This is where most first-time developers get surprised. Total development cost isn't just what the contractor charges you — it's everything.

    Break it into three buckets:

    • Hard costs: Actual construction — foundation, framing, mechanical, electrical, plumbing, finishes. This is the number your contractor bids.
    • Soft costs: Architecture, engineering, permits, legal, accounting, lender fees, construction management, insurance, interest carry during construction. First-time developers routinely underestimate this by 40-50%.
    • Land: Acquisition cost plus any site work (grading, utilities, environmental remediation) needed before construction starts.

    Benchmark carefully and locally. National averages are nearly useless for development budgeting. A Class A office building costs $250/SF in Nashville and $450/SF in San Francisco. Rural markets often run higher than you'd expect because material delivery and specialized subcontractor availability add cost. Always get local contractor bids before you finalize your model.

    3. Breakeven Occupancy

    What percentage of your building needs to be leased before rental income covers debt service plus operating expenses?

    The rule: I want breakeven occupancy below 65%. If you need 80%+ occupancy just to keep the lights on and make your loan payment, you're one vacancy away from writing checks out of pocket every month. In smaller markets where tenant pools are limited, this metric is even more critical — losing a single tenant in a 10,000 SF building hits a lot harder than in a 100,000 SF building.

    4. Cash-on-Cash Return at Stabilization

    After the building is constructed, leased up, and operating at its projected occupancy — what's your annual cash return on the equity you actually invested?

    The rule: For development risk, I want 12%+ cash-on-cash at stabilization. Anything below that and I should have just bought an existing building with immediate cash flow instead of tying up capital for two years with zero return during construction and lease-up.

    5. Internal Rate of Return (IRR)

    IRR captures what the other metrics miss: the time value of money across the entire project lifecycle. A project that generates a 9% annual return sounds decent until you realize your capital earned literally zero for 24 months during construction and lease-up, making the time-weighted return much less impressive.

    The rule: Development deals should target 18-25% IRR over a 5-7 year hold (including construction, lease-up, stabilization, and exit). This compensates for the complexity, the risk, and the opportunity cost of capital sitting idle during construction.

    How to Model Lease-Up Risk Without Lying to Yourself

    Lease-up is where development deals go to die. It's also where the most dangerous optimism creeps into your model. I've seen developers model a 6-month lease-up for a 40,000 SF building in a market that absorbs 3,000 SF per month. The math doesn't work, but the spreadsheet doesn't argue with you.

    Here's how I approach it honestly.

    Build Three Scenarios — Not One

    Base case: 10-15% of total leasable SF absorbed per month, starting 3 months after certificate of occupancy. This assumes your market is healthy, your building is well-positioned, and your broker is actively working the deal.

    Downside case: 5-8% per month, starting 6 months after CO. This is what happens when the market softens, your asking rents are slightly too high, or tenants take longer to make decisions than you expected.

    Disaster case: 3-5% per month, starting 9 months after CO. If your deal survives this scenario — meaning you can cover debt service from reserves without running out of cash — you have a resilient project.

    The key question: Which scenario do you use as your base assumption? Most developers use the optimistic one. Experienced developers use the downside case as their base and treat the optimistic scenario as upside. Your lender will appreciate this approach, and so will your investors.

    The Carrying Cost Trap

    Every month your building sits partially vacant, you're bleeding cash. Debt service, insurance, property taxes, basic maintenance, property management — these costs don't wait for tenants to show up.

    Model 18-24 months of carry costs as a line item in your total development budget. Not as a "contingency you probably won't need" — as a real budget line with real dollars allocated. This is the single item most likely to turn a profitable project into a capital call if you didn't plan for it.

    Pre-Leasing Changes Everything

    The single most de-risking thing you can do on a development deal is pre-lease space before you break ground. Getting Letters of Intent from tenants before construction starts does three things simultaneously:

    1. Validates your assumptions. If you can't get LOIs, the market is telling you something. Listen.
    2. Improves your financing. Lenders will offer better terms — often 50-100 basis points lower — when they see committed tenants.
    3. Compresses your lease-up timeline. Tenants who signed LOIs pre-construction typically take occupancy within 60-90 days of CO, meaning you start generating income almost immediately.

    In smaller markets, pre-leasing isn't optional — it's survival. A market with 500,000 people has enough tenant churn that absorption happens organically. A market with 10,000-50,000 people doesn't have that luxury. You need to know your tenants by name before you pour the foundation.

    Building Your Development Pro Forma

    Most experienced developers build custom Excel models because every deal has enough unique variables that off-the-shelf software can't capture the nuances. Here's what your model needs to include.

    The Six Essential Tabs

    1. Sources & Uses — Where every dollar comes from (senior debt, mezzanine debt, equity, grants, tax credits) and where it goes (land, hard costs, soft costs, reserves, financing costs). These two columns must balance. If they don't, your deal has a gap.
    2. Construction Draw Schedule — Month-by-month cash outflows during construction. Your construction lender funds draws based on completion milestones verified by a third-party inspector. Model the timing of draws carefully — you pay interest on funds drawn, not on the total commitment.
    3. Lease-Up Schedule — Month-by-month absorption across your three scenarios. Each new lease should flow into the operating pro forma automatically, building income gradually rather than assuming a magic day when the building goes from empty to full.
    4. Operating Pro Forma — Year-by-year income and expenses from CO through your exit. Include 3% annual rent growth (or whatever your market supports), realistic expense escalation (insurance and property taxes tend to grow faster than rents), and a capital reserves line for future maintenance.
    5. Cash Flow Waterfall — How cash gets distributed to stakeholders. Debt service gets paid first, then investor preferred returns, then promote splits. If you're raising outside equity, your investors will scrutinize this page more than any other.
    6. Sensitivity Analysis — This is the tab that separates amateurs from professionals. Build sensitivity tables showing how your key returns (IRR, cash-on-cash, equity multiple) change when you adjust critical variables: What happens if construction costs increase 10%? 20%? What if lease-up takes 6 months longer than projected? What if market rents come in 10-15% below your assumption? What if your exit cap rate is 100 basis points wider than projected? If your deal falls apart when any single variable moves by 15%, it's too fragile.

    Software vs. Spreadsheets

    ARGUS Developer is the industry standard for institutional-quality development modeling, but it runs around $5,000/year and has a steep learning curve. For most individual developers, a well-built Excel model is actually better because you understand every formula and assumption. Consider ARGUS when you're underwriting multiple large deals per year and need to present institutional-grade output to lenders and equity partners.

    Don't Leave Government Money on the Table

    If your project has any community benefit angle — job creation, blight removal, affordable housing component, infrastructure improvement — there's likely grant money available that most developers never pursue because the application process seems intimidating.

    CDBG (Community Development Block Grants): If your project serves a low-to-moderate income area or creates jobs, these can cover infrastructure improvements — roads, utilities, parking, sidewalks — that would otherwise come out of your development budget. That's real money back in your pocket.

    EDA (Economic Development Administration) Grants: For projects that bring employment to a community, EDA grants can cover 50-80% of infrastructure costs. They require matching funds but can be substantial.

    State-Level Programs: Most states have economic development agencies with grants, low-interest loans, and tax incentive programs for commercial development in targeted areas. These vary widely by state but are almost always underutilized.

    Opportunity Zones: If your parcel sits in a designated Opportunity Zone, investors in your deal can defer and reduce capital gains taxes, making your equity raise significantly easier and potentially cheaper.

    The critical rule: Model your deal without the grant first. If the project only works because of grant funding, that's a red flag. Grants should make a good deal great — they shouldn't be the difference between profitability and loss. Grant timelines are also unpredictable, so your construction schedule needs to accommodate potential delays.

    Five Mistakes That Rebuilt My Underwriting Process

    1. I Underestimated Soft Costs by Half

    On my first development deal, I budgeted 15% of hard costs for soft costs. Architecture, engineering, permits, legal review, lender fees, construction management, interest carry during construction, accounting — the real number was 28%. Now I budget 25-35% of hard costs for soft costs on every deal until I have enough completed projects in a specific market to refine that number with real data.

    2. I Built What I Assumed the Market Wanted

    Instead of asking the market what it actually needed. Before you finalize your project scope — before you hire an architect, before you apply for permits — talk to 20-30 potential tenants in your market. Ask what size spaces they need, what rent they can pay, what amenities matter. The number of times I've heard "we would have leased that space if only it had X" is painful. Let the market design your building.

    3. I Relied on a Single Contractor Bid

    Always get 3-5 competitive bids. Use a Guaranteed Maximum Price (GMP) contract with a shared savings clause — you and the contractor split any cost savings, which aligns incentives. Pure fixed-price contracts sound safe but often lead to aggressive change orders. GMP with shared savings gives the contractor motivation to find efficiencies while protecting your budget ceiling.

    4. I Ignored the Time Value of My Capital

    A deal that produces a 9% annual return sounds solid until you account for 24 months where your equity earned absolutely nothing during construction and lease-up. Simple return calculations hide this. IRR reveals it. I now calculate IRR on every development deal alongside static returns, and several deals that looked good on a napkin became clear passes once the time value of money was factored in.

    5. I Modeled Only One Exit

    I assumed I'd sell at a 7% cap in year five. What I didn't model: What if cap rates expanded to 8.5% by then? What if the market softened and I needed to hold for 10 years? What if I couldn't find a buyer at any price? Now I model three exit scenarios — optimistic, base, and downside — and the deal must still work in the downside case. If your returns evaporate when cap rates move 100 basis points, you don't have enough margin of safety.

    The Bottom Line

    Commercial development underwriting isn't about predicting the future — it's about stress-testing your assumptions until only the truth survives. The developers who consistently make money aren't smarter about market timing or construction management. They're more honest about what they don't know, and they build that honesty into every cell of their spreadsheet.

    Model conservatively. Pre-lease aggressively. Stress-test relentlessly. And make every deal work on paper in your downside scenario before you put a shovel in the ground.

    The upside in development is massive — creating value from nothing is the closest thing to magic in real estate. But the margin for error is thinner than any other strategy. Respect that, and the numbers will take care of themselves.

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Nicholas Cokas:

      How to Underwrite Commercial Development Deals: The Metrics, Models, and Mistakes That Actually Matter

      If you've been analyzing rental properties and small commercial deals, scaling up to ground-up development can feel like learning a new language. Here's the framework I use to underwrite commercial development projects — and the expensive lessons that built it.

      Making the jump from analyzing stabilized rental properties to underwriting commercial development deals is one of the biggest leaps in real estate investing. The core principles are the same — buy right, manage risk, create value — but the modeling gets dramatically more complex.

      With a rental property, you're analyzing what already exists. With development, you're projecting what might exist 18-24 months from now, betting your capital on assumptions about construction costs, tenant demand, and market conditions that haven't materialized yet.

      I've underwritten deals ranging from small mixed-use buildings to large-scale commercial projects, and I've learned that the difference between a profitable development and a disaster usually comes down to how honestly you modeled the unknowns before you broke ground.

      Here's the framework I use today — and the mistakes that forced me to build it.

      The Five Metrics That Drive Every Development Decision

      When you're analyzing a stabilized property, cap rate and cash-on-cash return tell most of the story. Development deals require a different toolkit. These are the five numbers I look at before anything else.

      1. Development Yield (Yield on Cost)

      This is THE metric for development deals. It's your projected stabilized Net Operating Income divided by your total development cost.

      Why it matters: Development yield tells you whether you're actually creating value or just taking construction risk for returns you could get buying an existing building. The magic number is the spread between your development yield and the market cap rate for comparable stabilized properties.

      The rule: If your development yield doesn't exceed the market cap rate by at least 150 basis points, the deal doesn't justify the risk.

      Example: Stabilized office buildings in your market trade at a 7% cap rate. Your total development cost is $3 million, and your projected stabilized NOI is $270,000. That's a 9% development yield — a 200 basis point spread over market. That's a deal worth pursuing. If that same project only generates $230,000 in NOI (7.7% yield), the 70 basis point spread doesn't compensate you for 18 months of construction risk, lease-up uncertainty, and capital tied up earning nothing.

      2. Total Development Cost Per Square Foot

      This is where most first-time developers get surprised. Total development cost isn't just what the contractor charges you — it's everything.

      Break it into three buckets:

      • Hard costs: Actual construction — foundation, framing, mechanical, electrical, plumbing, finishes. This is the number your contractor bids.
      • Soft costs: Architecture, engineering, permits, legal, accounting, lender fees, construction management, insurance, interest carry during construction. First-time developers routinely underestimate this by 40-50%.
      • Land: Acquisition cost plus any site work (grading, utilities, environmental remediation) needed before construction starts.

      Benchmark carefully and locally. National averages are nearly useless for development budgeting. A Class A office building costs $250/SF in Nashville and $450/SF in San Francisco. Rural markets often run higher than you'd expect because material delivery and specialized subcontractor availability add cost. Always get local contractor bids before you finalize your model.

      3. Breakeven Occupancy

      What percentage of your building needs to be leased before rental income covers debt service plus operating expenses?

      The rule: I want breakeven occupancy below 65%. If you need 80%+ occupancy just to keep the lights on and make your loan payment, you're one vacancy away from writing checks out of pocket every month. In smaller markets where tenant pools are limited, this metric is even more critical — losing a single tenant in a 10,000 SF building hits a lot harder than in a 100,000 SF building.

      4. Cash-on-Cash Return at Stabilization

      After the building is constructed, leased up, and operating at its projected occupancy — what's your annual cash return on the equity you actually invested?

      The rule: For development risk, I want 12%+ cash-on-cash at stabilization. Anything below that and I should have just bought an existing building with immediate cash flow instead of tying up capital for two years with zero return during construction and lease-up.

      5. Internal Rate of Return (IRR)

      IRR captures what the other metrics miss: the time value of money across the entire project lifecycle. A project that generates a 9% annual return sounds decent until you realize your capital earned literally zero for 24 months during construction and lease-up, making the time-weighted return much less impressive.

      The rule: Development deals should target 18-25% IRR over a 5-7 year hold (including construction, lease-up, stabilization, and exit). This compensates for the complexity, the risk, and the opportunity cost of capital sitting idle during construction.

      How to Model Lease-Up Risk Without Lying to Yourself

      Lease-up is where development deals go to die. It's also where the most dangerous optimism creeps into your model. I've seen developers model a 6-month lease-up for a 40,000 SF building in a market that absorbs 3,000 SF per month. The math doesn't work, but the spreadsheet doesn't argue with you.

      Here's how I approach it honestly.

      Build Three Scenarios — Not One

      Base case: 10-15% of total leasable SF absorbed per month, starting 3 months after certificate of occupancy. This assumes your market is healthy, your building is well-positioned, and your broker is actively working the deal.

      Downside case: 5-8% per month, starting 6 months after CO. This is what happens when the market softens, your asking rents are slightly too high, or tenants take longer to make decisions than you expected.

      Disaster case: 3-5% per month, starting 9 months after CO. If your deal survives this scenario — meaning you can cover debt service from reserves without running out of cash — you have a resilient project.

      The key question: Which scenario do you use as your base assumption? Most developers use the optimistic one. Experienced developers use the downside case as their base and treat the optimistic scenario as upside. Your lender will appreciate this approach, and so will your investors.

      The Carrying Cost Trap

      Every month your building sits partially vacant, you're bleeding cash. Debt service, insurance, property taxes, basic maintenance, property management — these costs don't wait for tenants to show up.

      Model 18-24 months of carry costs as a line item in your total development budget. Not as a "contingency you probably won't need" — as a real budget line with real dollars allocated. This is the single item most likely to turn a profitable project into a capital call if you didn't plan for it.

      Pre-Leasing Changes Everything

      The single most de-risking thing you can do on a development deal is pre-lease space before you break ground. Getting Letters of Intent from tenants before construction starts does three things simultaneously:

      1. Validates your assumptions. If you can't get LOIs, the market is telling you something. Listen.
      2. Improves your financing. Lenders will offer better terms — often 50-100 basis points lower — when they see committed tenants.
      3. Compresses your lease-up timeline. Tenants who signed LOIs pre-construction typically take occupancy within 60-90 days of CO, meaning you start generating income almost immediately.

      In smaller markets, pre-leasing isn't optional — it's survival. A market with 500,000 people has enough tenant churn that absorption happens organically. A market with 10,000-50,000 people doesn't have that luxury. You need to know your tenants by name before you pour the foundation.

      Building Your Development Pro Forma

      Most experienced developers build custom Excel models because every deal has enough unique variables that off-the-shelf software can't capture the nuances. Here's what your model needs to include.

      The Six Essential Tabs

      1. Sources & Uses — Where every dollar comes from (senior debt, mezzanine debt, equity, grants, tax credits) and where it goes (land, hard costs, soft costs, reserves, financing costs). These two columns must balance. If they don't, your deal has a gap.
      2. Construction Draw Schedule — Month-by-month cash outflows during construction. Your construction lender funds draws based on completion milestones verified by a third-party inspector. Model the timing of draws carefully — you pay interest on funds drawn, not on the total commitment.
      3. Lease-Up Schedule — Month-by-month absorption across your three scenarios. Each new lease should flow into the operating pro forma automatically, building income gradually rather than assuming a magic day when the building goes from empty to full.
      4. Operating Pro Forma — Year-by-year income and expenses from CO through your exit. Include 3% annual rent growth (or whatever your market supports), realistic expense escalation (insurance and property taxes tend to grow faster than rents), and a capital reserves line for future maintenance.
      5. Cash Flow Waterfall — How cash gets distributed to stakeholders. Debt service gets paid first, then investor preferred returns, then promote splits. If you're raising outside equity, your investors will scrutinize this page more than any other.
      6. Sensitivity Analysis — This is the tab that separates amateurs from professionals. Build sensitivity tables showing how your key returns (IRR, cash-on-cash, equity multiple) change when you adjust critical variables: What happens if construction costs increase 10%? 20%? What if lease-up takes 6 months longer than projected? What if market rents come in 10-15% below your assumption? What if your exit cap rate is 100 basis points wider than projected? If your deal falls apart when any single variable moves by 15%, it's too fragile.

      Software vs. Spreadsheets

      ARGUS Developer is the industry standard for institutional-quality development modeling, but it runs around $5,000/year and has a steep learning curve. For most individual developers, a well-built Excel model is actually better because you understand every formula and assumption. Consider ARGUS when you're underwriting multiple large deals per year and need to present institutional-grade output to lenders and equity partners.

      Don't Leave Government Money on the Table

      If your project has any community benefit angle — job creation, blight removal, affordable housing component, infrastructure improvement — there's likely grant money available that most developers never pursue because the application process seems intimidating.

      CDBG (Community Development Block Grants): If your project serves a low-to-moderate income area or creates jobs, these can cover infrastructure improvements — roads, utilities, parking, sidewalks — that would otherwise come out of your development budget. That's real money back in your pocket.

      EDA (Economic Development Administration) Grants: For projects that bring employment to a community, EDA grants can cover 50-80% of infrastructure costs. They require matching funds but can be substantial.

      State-Level Programs: Most states have economic development agencies with grants, low-interest loans, and tax incentive programs for commercial development in targeted areas. These vary widely by state but are almost always underutilized.

      Opportunity Zones: If your parcel sits in a designated Opportunity Zone, investors in your deal can defer and reduce capital gains taxes, making your equity raise significantly easier and potentially cheaper.

      The critical rule: Model your deal without the grant first. If the project only works because of grant funding, that's a red flag. Grants should make a good deal great — they shouldn't be the difference between profitability and loss. Grant timelines are also unpredictable, so your construction schedule needs to accommodate potential delays.

      Five Mistakes That Rebuilt My Underwriting Process

      1. I Underestimated Soft Costs by Half

      On my first development deal, I budgeted 15% of hard costs for soft costs. Architecture, engineering, permits, legal review, lender fees, construction management, interest carry during construction, accounting — the real number was 28%. Now I budget 25-35% of hard costs for soft costs on every deal until I have enough completed projects in a specific market to refine that number with real data.

      2. I Built What I Assumed the Market Wanted

      Instead of asking the market what it actually needed. Before you finalize your project scope — before you hire an architect, before you apply for permits — talk to 20-30 potential tenants in your market. Ask what size spaces they need, what rent they can pay, what amenities matter. The number of times I've heard "we would have leased that space if only it had X" is painful. Let the market design your building.

      3. I Relied on a Single Contractor Bid

      Always get 3-5 competitive bids. Use a Guaranteed Maximum Price (GMP) contract with a shared savings clause — you and the contractor split any cost savings, which aligns incentives. Pure fixed-price contracts sound safe but often lead to aggressive change orders. GMP with shared savings gives the contractor motivation to find efficiencies while protecting your budget ceiling.

      4. I Ignored the Time Value of My Capital

      A deal that produces a 9% annual return sounds solid until you account for 24 months where your equity earned absolutely nothing during construction and lease-up. Simple return calculations hide this. IRR reveals it. I now calculate IRR on every development deal alongside static returns, and several deals that looked good on a napkin became clear passes once the time value of money was factored in.

      5. I Modeled Only One Exit

      I assumed I'd sell at a 7% cap in year five. What I didn't model: What if cap rates expanded to 8.5% by then? What if the market softened and I needed to hold for 10 years? What if I couldn't find a buyer at any price? Now I model three exit scenarios — optimistic, base, and downside — and the deal must still work in the downside case. If your returns evaporate when cap rates move 100 basis points, you don't have enough margin of safety.

      The Bottom Line

      Commercial development underwriting isn't about predicting the future — it's about stress-testing your assumptions until only the truth survives. The developers who consistently make money aren't smarter about market timing or construction management. They're more honest about what they don't know, and they build that honesty into every cell of their spreadsheet.

      Model conservatively. Pre-lease aggressively. Stress-test relentlessly. And make every deal work on paper in your downside scenario before you put a shovel in the ground.

      The upside in development is massive — creating value from nothing is the closest thing to magic in real estate. But the margin for error is thinner than any other strategy. Respect that, and the numbers will take care of themselves.


       Thanks J.

      Appreciate you sharing this. development underwriting definitely feels like a different language compared to stabilized deals. I have a model I'm using but was wondering what other people were looking at to underwrite these deals. 

      The yield-on-cost vs market cap spread and lease-up assumptions you mentioned are exactly the areas I've been digging into lately. Modeling the downside scenarios seems to be where a lot of deals either hold up or completely fall apart.

      What's the biggest variable you've seen derail a deal most often? construction costs, lease-up timing, or something else?

  • Jaycee GreenePro Member
    Real Estate Consultant · St. Louis MSA · Member since 2024 · 3k+ posts · 728 votes
    8mo
    Quote from @Alex Wright:

    I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

    Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

    Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

    I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

    A few things I’m especially curious about:

    What metrics do you focus on most for development deals?

    How do you model lease-up risk or slower-than-expected absorption?

    Do you build your own spreadsheets or use specific tools?

    Any mistakes you made early on that changed how you analyze these deals?

    Would love to hear how people here structure their analysis before moving forward on a project.

    Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:

      I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

      Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

      Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

      I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

      A few things I’m especially curious about:

      What metrics do you focus on most for development deals?

      How do you model lease-up risk or slower-than-expected absorption?

      Do you build your own spreadsheets or use specific tools?

      Any mistakes you made early on that changed how you analyze these deals?

      Would love to hear how people here structure their analysis before moving forward on a project.

      Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?


      Thanks Jaycee! Its still in the works but we're actually looking at "partnering" with the state to build a "family center" of sorts. looking at 3-4 store fronts (hoping for a coffee shop in one of those- vanilla shell probably NNN, a preschool/daycare, a 6000 warehouse for my wife's business, and then the crown jewel, a "sports plex" I guess you could call it. probably 15,000+ sf climbing wall, foam pit, roller rink, batting cages, party rooms, etc.

      We have a meeting with the business council to discuss the potential setup but from the sound of it the way they like to do it is buy/build everything and then lease back to use for a minimum of 5 years and then we can buy it back. I'm a little nervous about that but There is no way we can fund it on our own when the project would probably land in the 6-8m range. But we'll see what terms they'd want!  

    • Jaycee GreenePro Member
      Real Estate Consultant · St. Louis MSA · Member since 2024 · 3k+ posts · 728 votes
      8mo
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:

      I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

      Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

      Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

      I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

      A few things I’m especially curious about:

      What metrics do you focus on most for development deals?

      How do you model lease-up risk or slower-than-expected absorption?

      Do you build your own spreadsheets or use specific tools?

      Any mistakes you made early on that changed how you analyze these deals?

      Would love to hear how people here structure their analysis before moving forward on a project.

      Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?


      Thanks Jaycee! Its still in the works but we're actually looking at "partnering" with the state to build a "family center" of sorts. looking at 3-4 store fronts (hoping for a coffee shop in one of those- vanilla shell probably NNN, a preschool/daycare, a 6000 warehouse for my wife's business, and then the crown jewel, a "sports plex" I guess you could call it. probably 15,000+ sf climbing wall, foam pit, roller rink, batting cages, party rooms, etc.

      We have a meeting with the business council to discuss the potential setup but from the sound of it the way they like to do it is buy/build everything and then lease back to use for a minimum of 5 years and then we can buy it back. I'm a little nervous about that but There is no way we can fund it on our own when the project would probably land in the 6-8m range. But we'll see what terms they'd want!  

       @Alex Wright Thanks for sharing. What is your "why" on this project?

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:

      I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

      Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

      Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

      I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

      A few things I’m especially curious about:

      What metrics do you focus on most for development deals?

      How do you model lease-up risk or slower-than-expected absorption?

      Do you build your own spreadsheets or use specific tools?

      Any mistakes you made early on that changed how you analyze these deals?

      Would love to hear how people here structure their analysis before moving forward on a project.

      Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?


      Thanks Jaycee! Its still in the works but we're actually looking at "partnering" with the state to build a "family center" of sorts. looking at 3-4 store fronts (hoping for a coffee shop in one of those- vanilla shell probably NNN, a preschool/daycare, a 6000 warehouse for my wife's business, and then the crown jewel, a "sports plex" I guess you could call it. probably 15,000+ sf climbing wall, foam pit, roller rink, batting cages, party rooms, etc.

      We have a meeting with the business council to discuss the potential setup but from the sound of it the way they like to do it is buy/build everything and then lease back to use for a minimum of 5 years and then we can buy it back. I'm a little nervous about that but There is no way we can fund it on our own when the project would probably land in the 6-8m range. But we'll see what terms they'd want!  

       @Alex Wright Thanks for sharing. What is your "why" on this project?


      Beyond the potential "good investment" opportunity, it fills a HUGE community need where I'm looking. There simply isn't anything like this in that area and there is high demand. People driving two hours to go to somewhere similar. Based on the regional service area demographics the concern of having people come is very minimal. 

    • Jaycee GreenePro Member
      Real Estate Consultant · St. Louis MSA · Member since 2024 · 3k+ posts · 728 votes
      8mo
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:

      I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

      Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

      Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

      I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

      A few things I’m especially curious about:

      What metrics do you focus on most for development deals?

      How do you model lease-up risk or slower-than-expected absorption?

      Do you build your own spreadsheets or use specific tools?

      Any mistakes you made early on that changed how you analyze these deals?

      Would love to hear how people here structure their analysis before moving forward on a project.

      Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?


      Thanks Jaycee! Its still in the works but we're actually looking at "partnering" with the state to build a "family center" of sorts. looking at 3-4 store fronts (hoping for a coffee shop in one of those- vanilla shell probably NNN, a preschool/daycare, a 6000 warehouse for my wife's business, and then the crown jewel, a "sports plex" I guess you could call it. probably 15,000+ sf climbing wall, foam pit, roller rink, batting cages, party rooms, etc.

      We have a meeting with the business council to discuss the potential setup but from the sound of it the way they like to do it is buy/build everything and then lease back to use for a minimum of 5 years and then we can buy it back. I'm a little nervous about that but There is no way we can fund it on our own when the project would probably land in the 6-8m range. But we'll see what terms they'd want!  

       @Alex Wright Thanks for sharing. What is your "why" on this project?


      Beyond the potential "good investment" opportunity, it fills a HUGE community need where I'm looking. There simply isn't anything like this in that area and there is high demand. People driving two hours to go to somewhere similar. Based on the regional service area demographics the concern of having people come is very minimal. 

       @Alex Wright I was hoping you'd say something like that...I might suggest checking out any CDFIs that fund loans in Wyoming, including mofi.org.

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:
      Quote from @Jaycee Greene:
      Quote from @Alex Wright:

      I'm embarking on the largest scale commercial development project. I've done very small ones but one is very large and even looking for grants from the local government as a community improvement opportunity. How are people here approach underwriting for commercial development projects?

      Most of my experience historically has been analyzing smaller residential deals and very small commercial, but with this larger commercial project, the modeling gets a lot more complicated pretty quickly.

      Construction costs, lease-up timelines, financing structure, exit assumptions, contingencies… there are a lot more moving parts than a typical rental property.

      I’ve been building my own modeling framework to help think through the numbers, but I’d love to hear how other investors approach it.

      A few things I’m especially curious about:

      What metrics do you focus on most for development deals?

      How do you model lease-up risk or slower-than-expected absorption?

      Do you build your own spreadsheets or use specific tools?

      Any mistakes you made early on that changed how you analyze these deals?

      Would love to hear how people here structure their analysis before moving forward on a project.

      Hey @Alex Wright, welcome to the BP Forum! How many units/tenants will there be in the property? And what type of tenants are you targeting? What type of lease structures will you have in place, (NNN, Absolute NNN, etc.) and how long will the leases run? Have you secured construction financing? And have you spoken to a lender about post-completion refinance?


      Thanks Jaycee! Its still in the works but we're actually looking at "partnering" with the state to build a "family center" of sorts. looking at 3-4 store fronts (hoping for a coffee shop in one of those- vanilla shell probably NNN, a preschool/daycare, a 6000 warehouse for my wife's business, and then the crown jewel, a "sports plex" I guess you could call it. probably 15,000+ sf climbing wall, foam pit, roller rink, batting cages, party rooms, etc.

      We have a meeting with the business council to discuss the potential setup but from the sound of it the way they like to do it is buy/build everything and then lease back to use for a minimum of 5 years and then we can buy it back. I'm a little nervous about that but There is no way we can fund it on our own when the project would probably land in the 6-8m range. But we'll see what terms they'd want!  

       @Alex Wright Thanks for sharing. What is your "why" on this project?


      Beyond the potential "good investment" opportunity, it fills a HUGE community need where I'm looking. There simply isn't anything like this in that area and there is high demand. People driving two hours to go to somewhere similar. Based on the regional service area demographics the concern of having people come is very minimal. 

       @Alex Wright I was hoping you'd say something like that...I might suggest checking out any CDFIs that fund loans in Wyoming, including mofi.org.


       Thanks Jaycee! I'll be sure to check that out.

  • Member since 2021 · 86 posts · 79 votes
    8mo

    @Alex Wright Great question, and now that I can see the actual deal shape — this changes the answer significantly.

    The #1 deal killer on development projects isn't construction costs or lease-up. It's the capital structure timeline mismatch.

    Here's what I mean specifically for your situation.

    You're looking at a $6-8M mixed-use project in Cody, WY where the business council wants to build/own everything and lease it back to you for 5 years with a purchase option. That structure has a hidden landmine most people don't see until they're already in it.

    The lease-back trap: When the government entity builds and leases back to you, they control the construction timeline, the specs, and the cost overruns. You're locked into lease payments the day they hand you keys — regardless of whether your sportsplex is generating revenue yet. A climbing wall and roller rink don't hit stabilized revenue on Day 1. You need 6-12 months of community awareness, birthday party bookings ramping up, league formations, membership growth. But your lease payment to the state starts immediately.

    That gap between "keys in hand" and "revenue covers lease" is where deals like this die.

    What I'd model before that meeting with the business council:

    1. Lease commencement timing. Push for rent abatement or graduated rent for the first 12 months. Start at 50% of full lease rate for months 1-6, 75% for months 7-12, full rate at month 13. This matches your revenue ramp. If they won't do this, your carry cost reserves need to be significantly larger.

    2. The purchase option price. Is it fixed at the development cost? Appraised value at year 5? If it's appraised value and you've built a thriving community hub, you could be paying a premium for value YOU created. Get the buyback price formula in writing before you agree to anything.

    3. NNN on the storefronts vs. the sportsplex. Your coffee shop and daycare tenants can handle NNN — those are standard commercial leases. But your sportsplex is an owner-operated business, not a tenant.

    Model it as a business P&L, not a lease. Revenue from admissions, parties, memberships, concessions — this is entertainment industry underwriting, not commercial real estate underwriting. Different animal.

    4. The 2-hour drive moat. You mentioned people driving 2 hours to reach something similar. That's a real demand signal — but it also means there's no comparable to benchmark your revenue projections against locally. Use revenue-per-square-foot data from similar facilities in comparable small markets (10K-50K population). National averages from urban sportsplex operations will overstate your numbers.

    To directly answer your question — construction costs are manageable with GMP contracts and competitive bidding. Lease-up risk on the storefronts is real but standard. The variable that derails deals like yours is the mismatch between when costs start and when revenue catches up, especially in a structure where you don't control the construction side. Model that gap honestly, fund it explicitly, and negotiate lease terms that reflect reality rather than the government's preferred timeline.

    Your "why" is strong — community need with a 2-hour drive moat is exactly the kind of demand signal that makes projects work. Just make sure the financial structure doesn't punish you for the 12 months it takes to prove that demand in revenue.

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Nicholas Cokas:

      @Alex Wright Great question, and now that I can see the actual deal shape — this changes the answer significantly.

      The #1 deal killer on development projects isn't construction costs or lease-up. It's the capital structure timeline mismatch.

      Here's what I mean specifically for your situation.

      You're looking at a $6-8M mixed-use project in Cody, WY where the business council wants to build/own everything and lease it back to you for 5 years with a purchase option. That structure has a hidden landmine most people don't see until they're already in it.

      The lease-back trap: When the government entity builds and leases back to you, they control the construction timeline, the specs, and the cost overruns. You're locked into lease payments the day they hand you keys — regardless of whether your sportsplex is generating revenue yet. A climbing wall and roller rink don't hit stabilized revenue on Day 1. You need 6-12 months of community awareness, birthday party bookings ramping up, league formations, membership growth. But your lease payment to the state starts immediately.

      That gap between "keys in hand" and "revenue covers lease" is where deals like this die.

      What I'd model before that meeting with the business council:

      1. Lease commencement timing. Push for rent abatement or graduated rent for the first 12 months. Start at 50% of full lease rate for months 1-6, 75% for months 7-12, full rate at month 13. This matches your revenue ramp. If they won't do this, your carry cost reserves need to be significantly larger.

      2. The purchase option price. Is it fixed at the development cost? Appraised value at year 5? If it's appraised value and you've built a thriving community hub, you could be paying a premium for value YOU created. Get the buyback price formula in writing before you agree to anything.

      3. NNN on the storefronts vs. the sportsplex. Your coffee shop and daycare tenants can handle NNN — those are standard commercial leases. But your sportsplex is an owner-operated business, not a tenant.

      Model it as a business P&L, not a lease. Revenue from admissions, parties, memberships, concessions — this is entertainment industry underwriting, not commercial real estate underwriting. Different animal.

      4. The 2-hour drive moat. You mentioned people driving 2 hours to reach something similar. That's a real demand signal — but it also means there's no comparable to benchmark your revenue projections against locally. Use revenue-per-square-foot data from similar facilities in comparable small markets (10K-50K population). National averages from urban sportsplex operations will overstate your numbers.

      To directly answer your question — construction costs are manageable with GMP contracts and competitive bidding. Lease-up risk on the storefronts is real but standard. The variable that derails deals like yours is the mismatch between when costs start and when revenue catches up, especially in a structure where you don't control the construction side. Model that gap honestly, fund it explicitly, and negotiate lease terms that reflect reality rather than the government's preferred timeline.

      Your "why" is strong — community need with a 2-hour drive moat is exactly the kind of demand signal that makes projects work. Just make sure the financial structure doesn't punish you for the 12 months it takes to prove that demand in revenue.


      Nicholas, thanks so much for the thorough run-through! Great stuff. Luckily we have about 3 people already asking about our flex storefronts. And my wife's business will be able to some of the space - all in all if we can get them pre leased, theres 120k-ish in rent but your point is very on point about getting to that stabilization period. That definitely wouldn't cover the lease but its a start. Again, really great insight. Much appreciated.

  • Developer · West Dover VT · Member since 2026 · 15 posts · 3 votes
    8mo

    You’re right — development underwriting is a completely different level from smaller residential deals. The complexity isn’t just more inputs, it’s how sensitive the deal becomes to small changes in assumptions.

    A few things I tend to focus on:

    1. Margin of safety (not just returns)
    More than IRR, I look at how much cushion exists between total cost and stabilized value. If that spread is thin, the deal becomes very execution-dependent.

    2. Construction + timeline risk
    Even small overruns in cost or delays in schedule can materially impact returns, especially once you layer in interest carry.

    3. Lease-up sensitivity
    I usually look at multiple scenarios — base case, slower absorption, and lower rents. A 3–6 month delay or slightly lower rents can change the outcome more than most people expect.

    4. Capital structure
    Debt terms, equity structure, and reserves matter a lot more than in smaller deals. The same project can work or not work depending on how it’s financed.

    On modeling — spreadsheets are still the core, but I’ve found the real value is less in the tool and more in how the assumptions are stress tested.

    One thing I’ve seen repeatedly is that early models tend to be optimistic on both timelines and costs. Adjusting those two variables alone often changes the deal significantly.

    Curious — are you modeling this more as a stabilized hold or a build-to-sell scenario?

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Jonathan Cannon:

      You’re right — development underwriting is a completely different level from smaller residential deals. The complexity isn’t just more inputs, it’s how sensitive the deal becomes to small changes in assumptions.

      A few things I tend to focus on:

      1. Margin of safety (not just returns)
      More than IRR, I look at how much cushion exists between total cost and stabilized value. If that spread is thin, the deal becomes very execution-dependent.

      2. Construction + timeline risk
      Even small overruns in cost or delays in schedule can materially impact returns, especially once you layer in interest carry.

      3. Lease-up sensitivity
      I usually look at multiple scenarios — base case, slower absorption, and lower rents. A 3–6 month delay or slightly lower rents can change the outcome more than most people expect.

      4. Capital structure
      Debt terms, equity structure, and reserves matter a lot more than in smaller deals. The same project can work or not work depending on how it’s financed.

      On modeling — spreadsheets are still the core, but I’ve found the real value is less in the tool and more in how the assumptions are stress tested.

      One thing I’ve seen repeatedly is that early models tend to be optimistic on both timelines and costs. Adjusting those two variables alone often changes the deal significantly.

      Curious — are you modeling this more as a stabilized hold or a build-to-sell scenario?


       Thanks Jonathan! Great insight. I'm planning on holding

  • Investor · Pacific Northwest · Member since 2026 · 538 posts · 315 votes
    8mo

    @Alex Wright 

    Most people approach development underwriting like it’s a bigger version of rental analysis.

    More tabs.

    More variables.

    More assumptions.

    That’s not actually what’s changing.

    What’s changing is you’ve moved from analyzing an asset… to coordinating a system that doesn’t exist yet.

    And that’s where most models quietly break.

    Construction costs don’t kill deals by themselves.

    Lease-up timing doesn’t kill deals by itself.

    Even financing rarely kills a deal on its own.

    What actually breaks deals is when multiple timelines fall out of alignment at the same time.

    Capital starts before revenue.

    Lease obligations start before demand is proven.

    Construction completes before tenants are ready.

    Operating costs begin before stabilization.

    Individually, each of those is manageable.

    Together, they compound.

    That’s why two deals with identical IRRs on paper can perform completely differently in reality.

    The difference isn’t the return metrics — it’s whether the system was aligned.

    When I look at development deals, I’m less focused on any single metric and more focused on sequence and dependency:

    • When does each cost actually hit?

    • When does each revenue stream realistically begin?

    • What assumptions depend on other assumptions being true first?

    • Where does timing stack on itself instead of flowing?

    Most underwriting models treat variables independently.

    In reality, they’re coupled.

    That’s also why “signal clusters” matter even more on development.

    Pre-leasing activity, local demand indicators, permitting velocity, tenant behavior — those aren’t just data points. They’re early indicators of whether your future timeline is going to hold or drift.

    If you model everything perfectly but your timing assumptions are off by 6–12 months, the returns don’t degrade linearly — they collapse.

    So the question isn’t just:

    “Does this deal work?”

    It’s:

    “Does this system stay aligned under stress?”

    That’s usually where the real answer shows up.

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Michael Eskenasy:

      @Alex Wright 

      Most people approach development underwriting like it’s a bigger version of rental analysis.

      More tabs.

      More variables.

      More assumptions.

      That’s not actually what’s changing.

      What’s changing is you’ve moved from analyzing an asset… to coordinating a system that doesn’t exist yet.

      And that’s where most models quietly break.

      Construction costs don’t kill deals by themselves.

      Lease-up timing doesn’t kill deals by itself.

      Even financing rarely kills a deal on its own.

      What actually breaks deals is when multiple timelines fall out of alignment at the same time.

      Capital starts before revenue.

      Lease obligations start before demand is proven.

      Construction completes before tenants are ready.

      Operating costs begin before stabilization.

      Individually, each of those is manageable.

      Together, they compound.

      That’s why two deals with identical IRRs on paper can perform completely differently in reality.

      The difference isn’t the return metrics — it’s whether the system was aligned.

      When I look at development deals, I’m less focused on any single metric and more focused on sequence and dependency:

      • When does each cost actually hit?

      • When does each revenue stream realistically begin?

      • What assumptions depend on other assumptions being true first?

      • Where does timing stack on itself instead of flowing?

      Most underwriting models treat variables independently.

      In reality, they’re coupled.

      That’s also why “signal clusters” matter even more on development.

      Pre-leasing activity, local demand indicators, permitting velocity, tenant behavior — those aren’t just data points. They’re early indicators of whether your future timeline is going to hold or drift.

      If you model everything perfectly but your timing assumptions are off by 6–12 months, the returns don’t degrade linearly — they collapse.

      So the question isn’t just:

      “Does this deal work?”

      It’s:

      “Does this system stay aligned under stress?”

      That’s usually where the real answer shows up.


      Thanks Michael! Great insight. I'm extremely confident in the demand, but like you pointed out, the timing would be key. Great project management seems even more important on these due to the scale. Delays on residential can cost your hundreds or thousands. Delays on this kind of project can cost your hundreds of thousands. Again, appreciate the insight! 

    • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
      8mo
      Quote from @Michael Eskenasy:

      @Alex Wright 

      Most people approach development underwriting like it’s a bigger version of rental analysis.

      More tabs.

      More variables.

      More assumptions.

      That’s not actually what’s changing.

      What’s changing is you’ve moved from analyzing an asset… to coordinating a system that doesn’t exist yet.

      And that’s where most models quietly break.

      Construction costs don’t kill deals by themselves.

      Lease-up timing doesn’t kill deals by itself.

      Even financing rarely kills a deal on its own.

      What actually breaks deals is when multiple timelines fall out of alignment at the same time.

      Capital starts before revenue.

      Lease obligations start before demand is proven.

      Construction completes before tenants are ready.

      Operating costs begin before stabilization.

      Individually, each of those is manageable.

      Together, they compound.

      That’s why two deals with identical IRRs on paper can perform completely differently in reality.

      The difference isn’t the return metrics — it’s whether the system was aligned.

      When I look at development deals, I’m less focused on any single metric and more focused on sequence and dependency:

      • When does each cost actually hit?

      • When does each revenue stream realistically begin?

      • What assumptions depend on other assumptions being true first?

      • Where does timing stack on itself instead of flowing?

      Most underwriting models treat variables independently.

      In reality, they’re coupled.

      That’s also why “signal clusters” matter even more on development.

      Pre-leasing activity, local demand indicators, permitting velocity, tenant behavior — those aren’t just data points. They’re early indicators of whether your future timeline is going to hold or drift.

      If you model everything perfectly but your timing assumptions are off by 6–12 months, the returns don’t degrade linearly — they collapse.

      So the question isn’t just:

      “Does this deal work?”

      It’s:

      “Does this system stay aligned under stress?”

      That’s usually where the real answer shows up.


      Thanks Michael! Super insightful. I'm very confident on the demand. I'd have some units pre leased too which would help, but like you pointed out, delays can cost you. It seems like its even more important to have solid project management with these sorts of endeavors. residential delays can cost your thousands but development delays can cost you hundreds of thousands. Again, really appreciate the insight!

  • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
    8mo

    hmm sorry for the double post. cant figure out how to delete it. There was an error posting the first time so I figured it hadn't posted. Whoops! 

  • Investor · Cody WY, USA · Member since 2020 · 50 posts · 31 votes
    8mo

    Are you guys using a specific tool to analyze these or just a spreadsheet purest? 

    • Investor · Pacific Northwest · Member since 2026 · 538 posts · 315 votes
      8mo

      @Alex Wright 

      Most people default to spreadsheets because they’re the cleanest place to organize a deal once you already have your assumptions.

      But that’s not really where the leverage is.

      Spreadsheets are great at telling you what happens if your assumptions are true.

      They’re not great at helping you figure out whether your assumptions are true in the first place.

      So you end up with very clean models built on inputs that are lagging or incomplete.

      What’s been more interesting to me is working one layer upstream from that—before anything hits a pro forma:

      Looking at how demand is actually forming

      What types of tenants are being created in a market

      How stable or fragile that demand is likely to be

      How fast it realistically converts into occupancy

      Once you have that, the spreadsheet becomes almost mechanical. It’s just organizing reality.

      Without it, you’re effectively using the spreadsheet to guess.

      Most people stay inside the model and try to improve it.

      The real shift happens when you start improving what feeds it.

  • Specialist · Greeley, CO · Member since 2026 · 36 posts · 18 votes
    8mo

    Alex, the jump from residential to larger commercial development is a different animal. You're right that the moving parts multiply fast. A few things that made a difference for me:

    Metrics that matter most for development:

    • Yield on Cost (NOI at stabilization / total project cost) — this is the development equivalent of a cap rate. If your yield on cost isn't meaningfully higher than what you could buy a stabilized property for, the development risk isn't worth it. I want at least 150-200 basis points above market cap rates.
    • Return on equity / IRR — I model multiple exit scenarios (sell at stabilization, hold long-term, refinance and hold) and look at IRR for each. Forces you to think about the deal from different angles.
    • Break-even occupancy — what occupancy percentage do you need just to cover debt service and operating expenses? If that number is above 75-80%, you have very little margin for error during lease-up.

    Modeling lease-up risk:

    I build three scenarios — base case, slow absorption, and worst case. For each one I vary the lease-up timeline and the concessions you'll need to offer (free rent, TI allowances). The difference between a 12-month lease-up and an 18-month lease-up on a large project can be hundreds of thousands in additional carry costs.

    Also model your construction loan interest during the lease-up period separately from your permanent financing. That carry cost during the gap between completion and stabilization is where deals can quietly fall apart.

    On tools:

    I started with Excel and still use it for quick scenarios, but honestly the more complex the deal, the more time I spend debugging formulas instead of thinking about the deal. For anything with multiple tenants, phased lease-up, and structured financing, I've been moving toward purpose-built tools that handle the time-based calculations automatically.

    Biggest early mistake:

    Underestimating soft costs and timeline padding. My first development pro forma had construction hard costs nailed but I was light on architectural, engineering, permitting, legal, and the inevitable 3-6 month delays. I now add 15-20% contingency on top of everything and pad the timeline by at least 3 months. If you're ahead of schedule and under budget, great — but plan for the opposite.

    On the grant angle — the structure of government grants or TIF financing can meaningfully change your return model. Make sure you model the grant as a separate capital source with its own terms (clawback provisions, compliance periods) rather than just reducing your total cost. The compliance requirements can add ongoing costs that offset part of the benefit.

    Good luck with the project. Sounds like you're approaching it the right way by building the model before committing capital.