For those doing fix-and-flips, what’s one expense that caught you off guard on a project?
An unexpected repair is one thing. Having it eat into the money set aside for your next contractor payment or materials order is another.
I work with business owners and investors on business funding, and I’m always interested in the gap between the original renovation budget and what it actually takes to finish.
Was it electrical, plumbing, permits—or something you didn’t even think to budget for?
Good day @Nicholas Floyd . What we see most often is the work that shows up after the walls are opened: old pipes, a wet subfloor, wiring that is not to code. The first budget cannot show it, because nobody has seen it yet.
What helps is a separate line for it from the start, and a rule that every piece of additional work gets its own price and one approval before work goes on, so it never eats the next contractor payment.
In your funding work, is that reserve normally built into the loan, or do owners find the money elsewhere when it shows up?
For me it is not a single line item, it is a bad layout. I buy single-family BRRRR houses in Memphis under $100K, and I look for a 2/1 I can turn into a 3/1, or a 3/1 into a 4/2. A carport conversion can do that when the footprint and roofline work. If the layout does not work, the rehab keeps growing, the rent does not, and the deal falls apart. I underwrite to the 1% rule, target an ARV of $180K-$265K, and for Section 8 I look at $1,395-$1,950 for 3-bed-plus houses. My in-house property management team has to rent it and maintain it after closing, so a house that only looks good on paper costs me every month. I plan for it now by walking the layout first and passing if the extra bedroom does not flow like a real bedroom.
That makes sense, James. The rehab keeps growing but the rent doesn’t—that really sums it up. Having your own team manage the property afterward gives you a reason to be selective upfront. What’s the biggest layout red flag that makes you walk away from a deal?
Good day @Nicholas Floyd . What we see most often is the work that shows up after the walls are opened: old pipes, a wet subfloor, wiring that is not to code. The first budget cannot show it, because nobody has seen it yet.
What helps is a separate line for it from the start, and a rule that every piece of additional work gets its own price and one approval before work goes on, so it never eats the next contractor payment.
In your funding work, is that reserve normally built into the loan, or do owners find the money elsewhere when it shows up?
Good point, Vladimirs. It depends on the lender and how the deal is structured—some loans include a contingency reserve, while others leave owners covering unexpected costs separately.
My focus is helping business owners explore working capital options for expenses like those, subject to qualifications and funding terms. Planning that cushion upfront can help keep surprises from disrupting contractor payments.
Do you typically see owners set aside a reserve, or do most start looking for funds once the extra work comes up?
On our side we do not chase a built-in reserve. We price every step in detail and think through what could come up before the work starts, so each side knows where the project is going.
If something unplanned does appear, we explain the reason and give a detailed figure before work goes on.
When you look at a rehab budget, what makes you comfortable with the size of a reserve: one total from the contractor, or a line-by-line budget by stage?
Hi Nicholas, I am still learning, and I walk houses to talk to sellers, not to rehab them, so I see this from the buying side. The one thing I have learned is to slow down and look twice at the layout before I look at anything else. If the layout does not make sense when I walk it, or I cannot tell what is behind the walls, I would rather pass than try to fix it with money later. A deal I walk away from costs me nothing, and a bad one keeps costing me after I close. I keep a short note on each walkthrough so I remember what I saw and what I still did not know.
Nicholas, from the agent side, the expense I see catch first-time rehabbers off guard is not one line item — it's the holding cost while the rehab runs long. The roof or HVAC that looked fine at the walkthrough turns out to be near the end of its life, the walls open up and the budget grows, and meanwhile the mortgage, insurance, and taxes keep coming every month with no rent yet. James's point about layout is the same lesson in a different form: a rehab that doesn't raise the rent or the value doesn't pay for itself. The discipline Vladimirs describes is what I'd copy — a separate reserve line from the start, and no extra work without its own price and approval before it starts.
@Ametria Chaney , sorry for the late reply, no notification came through and I missed your post. Thank you. A separate reserve line turns any delay into a number: how many weeks the budget still covers. Then the owner decides early, not late.
In Memphis, what hurts more on a stalled rehab: insurance on a vacant house or the taxes?
Ametria, great point about holding costs. It’s easy to focus on the repair budget and overlook what another month or two can cost while the property sits. I appreciate your point about pricing and approving extra work before it starts, too.
From what you’re seeing in Memphis, what tends to cause the biggest delays for first-time rehabbers?