How are you guys verifying rehab budgets before funding?
Jered here, real estate broker and veteran in Springfield, IL. Wanted to share something I've been working on and get some honest feedback, especially from lenders.
I kept seeing the same thing happen on rehab deals. A loan gets funded off a one page contractor bid or the borrower's own estimate, then the walls come open and the budget is suddenly way off. Now everybody's fighting over draws halfway through the job and the lender's money is sitting in a half finished house.
So I started writing a line item renovation scope before the deal funds. I walk the property and go room by room and system by system, and every item gets a quantity and a cost. The walk takes about an hour and the report is back the next day.
What really sold me on it was a fire loss property. Smoke and water hide a lot of damage and a quick bid would have missed half of it. Having everything written out gave the lender something they could actually underwrite. Since then two six figure rehab deals have been funded off these scopes.
The way I see it, the lender gets a real number to lend against instead of trusting one contractor. Draws are easier because there's a baseline to check progress against. The borrower finds the surprises before closing instead of after demo. And contractors are all bidding the same work, so you can actually compare quotes.
For the lenders on here, what are you doing right now before you fund? Your own inspector, the contractor's bid, something else? And for the rehabbers, has a bad scope ever burned you on a draw?
Curious how others around Central Illinois are handling it.