Would you order the cabinets before your next draw comes in?

Would you order the cabinets before your next draw comes in?

Nicholas FloydBusiness Member
NY · Member since 2026 · 387 posts · 117 votes

Say you’re halfway through a flip.The supplier has the cabinets you need,
and your contractor can install themnext week. Your next rehab draw is
still two weeks out. If you wait, your contractor might already be on another job.

Would you use cash reserves,buy the cabinets with a 0% intro APR
business card, or wait for the draw?If you’ve been in that spot, what did
you do? Did it keep the job on schedule?

1Reply
40 views

Most Popular Reply

Developer · Riga, Latvia | Switzerland | Florida · Member since 2026 · 195 posts · 41 votes
28m

Good day @Nicholas Floyd. The cabinets usually come back with the draw that follows the install, after the inspector signs it off, so the real float is longer than the date on the calendar.

That is why any of these routes works, if the order day records which draw repays it. A 0% card then becomes a bridge with an end date, not an open balance.

When your clients put materials on 0% credit, do they tie the payoff to a specific draw, or does it run until the intro period ends?

See this reply in the discussion

6 Replies

Jump to latestLatest
  • Real Estate Consultant · Massapequa Park, NY · Member since 2026 · 9 posts · 2 votes
    1h

    Good question, Nicholas. I have seen this timing gap come up a lot on flips. The part I would lock down first is the written order: the cabinet order, the install date, and what happens if the draw date moves. If the contractor can hold the install week in writing and the supplier can hold the cabinets, the decision gets a lot simpler. A second check is the allowance and lead time in the original scope, so the cabinet cost is not a surprise on top of the draw timing. What I would not do is rush the order just to keep the schedule, without that written confirmation from both sides. Curious what others here have done when the draw and the install week did not line up.

    • Nicholas FloydBusiness Member
      OP
      NY · Member since 2026 · 387 posts · 117 votes
      24m

      Ioannis, I like your point about getting the install week in writing. I’d also ask the supplier if a deposit would hold the cabinets and when the balance is due. That tells you how much cash you actually need to cover until the draw comes through. Have you had suppliers hold an order that way?

  • Christian LeonBusiness Member
    Lender · Miami, FL · Member since 2026 · 29 posts · 17 votes
    1h

    Usually yes, if you have the cash and the cabinets are already on the approved budget. Most draws reimburse completed work, so the real risk isn't buying early, it's the cabinets sitting in a garage where the inspector can't count them. Some lenders will fund materials that are delivered and stored on site and some won't until they're installed, so I'd ask yours before you order. Losing your contractor for 3 or 4 weeks usually costs more than floating cabinets for two.

    Trato Lending510 Reviews
  • Developer · Riga, Latvia | Switzerland | Florida · Member since 2026 · 195 posts · 41 votes
    28m

    Good day @Nicholas Floyd. The cabinets usually come back with the draw that follows the install, after the inspector signs it off, so the real float is longer than the date on the calendar.

    That is why any of these routes works, if the order day records which draw repays it. A 0% card then becomes a bridge with an end date, not an open balance.

    When your clients put materials on 0% credit, do they tie the payoff to a specific draw, or does it run until the intro period ends?

    • Nicholas FloydBusiness Member
      OP
      NY · Member since 2026 · 387 posts · 117 votes
      25m

      Good point, Vladimirs. I’d tie the payoff to a specific draw. With cabinets, I’d confirm which draw covers them before placing the order, then pay the card off when that draw hits. That leaves some room in the 0% period if the inspection gets pushed back. How much time do you usually budget between sign-off and the funds hitting your account?

  • Noah WrightBusiness Member
    Lender · USA, Nationwide · Member since 2024 · 613 posts · 174 votes
    18m

    Card, as long as the draw is sized to cover the cabinets and you'd still have reserves left if it slips. Asking this before you're stuck is the right instinct. The detail that tips it is that a lot of draw lenders only reimburse cabinets once they're installed, not while they're boxed in the garage, so getting them in next week is what lets the draw pay for them. Waiting costs you the contractor and pushes that reimbursement back too. The 0% card beats cash because it leaves your reserves for whatever actually goes wrong mid-flip, and an intro period usually runs months, which easily outlasts a draw that comes in a couple weeks late. Short-term money is fine when you can name the check that pays it off.

Join the conversationCreate a free account to reply, vote on answers and follow this thread.