Genuine question for operators running multiple rehabs: how many spreadsheets/trackers are you keeping per property, and which one bites you most — the draw request log, holding costs, or contractor payments? When your lender calls for a total, do you have one number ready or are you adding up tabs? And has a draw delay ever cost you real money — how much?
Richard, the number a lender wants is usually not the same as the number in the draw log. The draw log is what they've funded. Total spend is purchase and closing, every contractor payment, materials you bought yourself, permits, and holding costs (interest, taxes, insurance, utilities). If those live in different tabs, the total is always stale.
One property ledger with those lines in it, updated when money leaves the account, is enough. The holding-cost line is the one that quietly moves. On a $200K loan at 12%, a two-week draw delay is about $920 of extra interest, and the job often sits still while you wait, which can add another week or two.
Richard, the number a lender wants is usually not the same as the number in the draw log. The draw log is what they've funded. Total spend is purchase and closing, every contractor payment, materials you bought yourself, permits, and holding costs (interest, taxes, insurance, utilities). If those live in different tabs, the total is always stale.
One property ledger with those lines in it, updated when money leaves the account, is enough. The holding-cost line is the one that quietly moves. On a $200K loan at 12%, a two-week draw delay is about $920 of extra interest, and the job often sits still while you wait, which can add another week or two.
Hossein — that line about the lender number never matching the draw log stuck with me. When you catch the mismatch, what does the fix actually look like on your end? Are you rebuilding the draw against the lender's schedule line by line, or is it more that the request itself went in wrong? Just trying to understand where the time really goes.
Hi Richard, I'd keep it to one ledger per property, with every dollar entered the day it leaves the account and sorted into a handful of buckets: purchase and closing, contractor payments, materials you buy yourself, permits and fees, and holding costs like interest, taxes, insurance and utilities. Keep the draw log separate, because it only shows what the lender has funded, not what you've actually spent. Mixing the two is how you end up adding up tabs when the lender calls.
The bucket that bites most people is contractor payments, because deposits and materials go out before the draw comes back. Track what you've paid each sub against their bid, phase by phase, so you always know what's left on each contract and how much you're floating out of pocket.
On draw delays, the interest is the smaller part. The real cost is a sub moving to another job while you wait, which can stretch the schedule a week or two and pile on more holding costs. Keeping enough cash to cover one phase means a slow draw doesn't stop the job.
Good question, Richard. One ledger per property is the right call, and I would tie every contractor payment in it to a scope line and a verified milestone before it gets entered. That way the total spend number is not just a sum of receipts, it is a check against the written scope, and you can see right away if a payment went out for work that was not in the scope. I would keep the draw log separate from the ledger, like Redgy said, and reconcile the two each time a draw lands so the lender number and the ledger number never drift apart. The contractor payments bucket is the one to watch closest, because deposits and materials go out before the draw comes in, and once money is out it is hard to get back if the scope was not clear.
I keep one ledger per property and tag every cost as purchase, rehab, holding or financing. The total is then one sum. People forget to log holding costs. That means taxes, insurance, utilities and interest. I enter them monthly. I also match each draw to paid invoices every week. Your lender then gets one number that ties out, with no tabs to add up.
Hossein and Redgy covered the ledger well. In Switzerland we saw one more thing: a stage only counts as spent once it is accepted with a photo. Until then it is a promise, not a cost, and that makes "how much have I spent?" an easy question to answer.
Does that question come up more often at 7 am or after the second coffee? 🙂
Good question, and the mix-up usually comes from counting three different totals as one.
I keep one sheet per property, with three columns: paid, committed, and remaining to finish. A contractor payment goes in the day it is paid, with the invoice and a photo of that stage attached. Materials bought for that address go on the same sheet, even if I bought them on the same trip as another property.
Holding costs get their own line, separate from rehab. That way I can answer two questions cleanly: what the rehab itself cost, and what the property cost all-in including interest, taxes, and insurance while it sat.
Once a week I reconcile paid against the draw schedule, so a delayed draw does not look like underspending. If a number still does not match, I check committed first — that is usually a partial payment or an invoice waiting to be logged.