Knocking down the kitchen wall on an older single-family worth the $8k, or overkill?

Knocking down the kitchen wall on an older single-family worth the $8k, or overkill?

Real Estate Agent · Houston, TX · Member since 2026 · 44 posts · 18 votes

When you walk into a classic 1970s or 1980s single-family home, the kitchen is almost always boxed off from the living room by a single wall—and nine times out of ten, it’s load-bearing.

That forces an immediate underwriting call:

Some flippers automatically budget $6k to $10k to engineer a flush LVL beam, relocate electrical and plumbing stacks, and blow the wall wide open. Their take is that modern retail buyers won't touch a closed-off galley kitchen, and that open sightlines from the front door are what actually push a flip to top-of-market ARV.

Other operators leave the layout completely intact. Instead of spending five figures and adding two weeks of structural permits and drywall dust, they keep the footprint as-is, throw in clean shaker cabinets, modern quartz, and good lighting, and price the house $10k sharper to move it fast.

For those of you turning single-family houses right now: are you still paying to open up load-bearing kitchen walls, or do you keep the original footprint to protect your timeline and margin?

3Reply
473 views

Most Popular Reply

Rental Property Investor · Boston, MA · Member since 2021 · 24 posts · 10 votes
1d

Agree with Kyle. And I'd add two things from the commercial side.

First, I'd treat $8k as the minimal case. In the Boston area, once you add the engineer, permit, temporary shoring, and an inspection before you close the walls back up, I'd budget $8–15k.

Before you buy, check the basement under the wall and the roof above it if possible. A vent pipe or posts can tell you most of what's inside.

Second, it depends on your exit. On a flip with a full kitchen gut and comps that support it, open it. On my buy-and-holds I tend to leave the wall. Tenants pay for a clean, working kitchen, not always the sight lines.

See this reply in the discussion

15 Replies

Jump to latestLatest
  • Real Estate Agent · Kansas City · Member since 2018 · 5k+ posts · 3k+ votes
    3d

    Ideally opening up is the way to go. I don't think if it's the end of the world if you don't but helps sell. If you are targeting it being a rental then I'd leave the layout alone.

  • Investor · Cuyahoga Falls, OH · Member since 2026 · 24 posts · 3 votes
    2d

    Hi Alejandro, good question, and it's really a numbers question more than a design question.

    The way I'd look at it is through the comps. What did the open-concept homes in that neighborhood actually sell for, compared to the ones that kept the original layout? If the open ones are selling meaningfully higher, the $8k can earn its way back. If the gap is small, it's money out of your margin.

    The other piece is time. Two extra weeks of permits and structural work is two more weeks of carrying costs — loan payments, insurance, taxes — on top of the $8k. So the real cost is a little more than the beam.

    And one more thing worth checking: the appraisal has to agree with the ARV. If the comps don't support top-of-market, the open kitchen won't change that, and you'd have spent the money and the time for a number the appraiser won't give you.

    So I'd say: let the sold comps decide. If they support the open layout, open it. If they don't, clean cabinets, good light, and a sharper price is the smarter move.

  • Flipper/Rehabber · CA · Member since 2023 · 1k+ posts · 1k+ votes
    2d

    Yep, its in the comps. Generally they've been good $ makers for me, but even with my in house labor by the time im done w/engring, prints & permits they're in the $25kish range. Also ive always used PSL

  • Chicago, Cook County · Member since 2026 · 52 posts · 22 votes
    2d

    The $8k is usually not the

    number that hurts. It's what

    you find once the wall is open:

    - Check what's in the wall

    first. A plumbing vent, a

    duct, or a gas line can add

    a lot fast.

    - Look below the wall. The new

    posts need support down to

    the footing, which can mean

    basement or crawl space work.

    - Price the patch work too.

    Floor, ceiling, and drywall

    where the wall used to be.

    - Ask the engineer early. A

    flush beam costs more than a

    dropped beam.

    - Then check the comps. If open

    layouts don't sell higher

    there, leave it and spend on

    finishes.

    Kyle

    • Rental Property Investor · Boston, MA · Member since 2021 · 24 posts · 10 votes
      1d

      Agree with Kyle. And I'd add two things from the commercial side.

      First, I'd treat $8k as the minimal case. In the Boston area, once you add the engineer, permit, temporary shoring, and an inspection before you close the walls back up, I'd budget $8–15k.

      Before you buy, check the basement under the wall and the roof above it if possible. A vent pipe or posts can tell you most of what's inside.

      Second, it depends on your exit. On a flip with a full kitchen gut and comps that support it, open it. On my buy-and-holds I tend to leave the wall. Tenants pay for a clean, working kitchen, not always the sight lines.

  • Rental Property Investor · Philadelphia, PA · Member since 2021 · 794 posts · 510 votes
    1d

    @Alejandro Lopez - I agree with Kyle. I think removing the wall is worthwhile, but it's what's inside that may blow the budget. I took at a wall I had in my personal resident that had some ductwork for the second floor, but I was ok with that because I was already installing a second HVAC unit in the attic.

  • Investor · San Antonio, TX · Member since 2026 · 24 posts · 4 votes
    1d

    Alejandro, I'd only open it if the comps in your price range show open layouts selling higher. On the 70s and 80s houses I flip, a closed-off kitchen is usually the first thing buyers complain about, so I do it when the all-in number stays near $8k and the beam lands on solid support. If the wall is carrying plumbing or the footing is bad, I skip it and take the $10k price cut. Get an engineer to look before you commit either way.

  • Noah WrightBusiness Member
    Lender · USA, Nationwide · Member since 2024 · 614 posts · 174 votes
    1d

    Open it when the sold comps say to, and Jay, Alan and Trevor already have that part right. Laying out both camps this clearly is the right instinct, too. The piece I'd add is how to read those comps. Go through the listing photos of every sale in your price band and count which kitchens were actually open, because listing remarks rarely say whether a wall came out. Ten sales sorted by photo will tell you more than any rule of thumb about 70s and 80s houses.

    If it's on a rehab loan, put the beam in the scope of work before closing. Many rehab lenders want the permit and the engineer's letter before they release a draw for structural work, and a mid-project change order slows the money down. Are you buying these with cash or with a rehab loan?

  • Gainesville, Alachua County · Member since 2026 · 15 posts · 2 votes
    1d

    Agree with Noah on getting the permit and engineer's letter in hand before the lender will release that draw. The other thing I'd price in is where the wall sits on the schedule.

    The beam usually has to pass a framing inspection before insulation and drywall can close, so it's on the critical path. If the engineer, permit review and inspection add 2 to 3 weeks and the house burns $100 a day in interest, taxes, insurance and utilities, the real cost is closer to $8k plus $1.5k to $2k of holding, before any surprise in the wall.

    So the test I'd use: do the open-concept comps beat the closed ones by more than that all-in number after selling costs? If yes, open it, and submit the permit the week you close so the review runs during demo. If it's close, or the wall is carrying plumbing, Trevor's call to skip it and price the house sharper makes sense.

  • Flipper/Rehabber · CA · Member since 2023 · 1k+ posts · 1k+ votes
    1d

    Lol, you don't have to open walls to find infrastructure. Whoever doing the estimate should; be familiar w/that areas building practises. Crawl & check bottom& top plates. Utility locator, heck even a phone toner is highly useful (yes even metallic gas& water. Ive got a stethoscope thats really handy.

    Someones gonna open every wall bay to find stuff!? C'mon

  • Deltona, Volusia County · Member since 2026 · 1 post · 0 votes
    21h

    What do you think about compromising by incorporating a cutout in the wall rather than opening it up completely? I am considering doing this in my current flip rather than the entire wall.

    • Flipper/Rehabber · CA · Member since 2023 · 1k+ posts · 1k+ votes
      4h

      Its pretty common, leaving the entrys on each side and heading out an opening. Have a breakfast nook with a counter. Make sure proper framing with a header is done. Low end flippers cut corners on this, i.e. no header, improper jacks studs etc.

      FWIW this open concept rework isn't new by any means. Eichler started alot of this back in the late 40's

    • Flipper/Rehabber · CA · Member since 2023 · 1k+ posts · 1k+ votes
      3h

      I forgot to explicitly mention these are usually load bearing walls.

  • Noah WrightBusiness Member
    Lender · USA, Nationwide · Member since 2024 · 614 posts · 174 votes
    19h

    That's the right test, and filing the permit the week you close is the move most people only learn after a delay. One thing I'd add: the holding clock runs on the closed side too. If the untouched house priced sharper sells faster, those saved days are worth your $100 a day as well. So compare days on market for the open and closed comps, not just sold price. On a rehab loan that cuts both ways, since the closed-layout version is also the one with no structural draw waiting on paperwork. Your $8k plus $1.5k to $2k already sits close to the $10k price cut in the opening post, so the gap may be thinner than it looks. What are days on market showing for the closed-kitchen sales in your band?

  • Real Estate Agent · Chicago, IL · Member since 2017 · 2k+ posts · 2k+ votes
    4h

    Having a nice open modern layout is very important! This is also true for apartments, the nice open layout is what gets you the highest rents and the quickest lease up times. In Chicago my market its differant from most places in that not many people actually pull permits on non gut rehabs (not saying this is right), when I look up rehabbed properties in the system typically less then 10% of them have permits done. So the cost people spend to do it is much lower for the most part. With permits and all the costs it just needs to be justified by the ARV.