Skip to content

Let's keep in touch

Subscribe to our newsletter for timely insights and actionable tips on your real estate journey.

By signing up, you indicate that you agree to the BiggerPockets Terms & Conditions
Followed Discussions Followed Categories Followed People Followed Locations
California Real Estate Q&A Discussion Forum
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

User Stats

3
Posts
0
Votes
Kitty Tan
0
Votes |
3
Posts

applying building permit by yourself

Kitty Tan
Posted

I am planning on getting a building permit myself for a conversion I am planning on doing. From a living room to a studio apartment with bathroom and kitchen. Just wondering anyone had experience about apply building permit by themselves. I would love to hear more about it, such as what plans you submitted and so on.

User Stats

179
Posts
192
Votes
David Cruice
  • Rental Property Investor
  • Raleigh, NC
192
Votes |
179
Posts
David Cruice
  • Rental Property Investor
  • Raleigh, NC
Replied

Don't do it yourself.  You'll regret it.  Find a good contractor, highly recommended by fellow RE investors in your area.  Ask the investors if they would advise doing the work with or without permits.  Yes, I know the former is the right way to go, but sometimes it is more trouble than it is worth.  All depends on your municipality. 

User Stats

100
Posts
53
Votes
Elizabeth Goff
  • Investor
  • Napa, CA
53
Votes |
100
Posts
Elizabeth Goff
  • Investor
  • Napa, CA
Replied

I think it depends on where you are located.  I would suggest just going to the building department and talk to them about their needs.  I ended up doing plans myself for a renovation and all was fine -- but I had an ally at the building department and some experience in design/construction so that helped a bit.  I did have my electrician do an electrical plan overlay for the electrical in the kitchen, so that is one factor.

I will also say that there are crazy energy regulations in place in CA that can impact the electrical and HVAC.  If you need to do HVAC in particular you will need to hire someone outside regardless. 

So depending on your experience level may just be better to hire someone for plans!

RentRedi logo
RentRedi
|
Sponsored
2 Rentals Today. 20 Tomorrow. Same $12/month Price. Collect rent, screen tenants, manage maintenance, track finances, measure performance.

User Stats

23,418
Posts
13,512
Votes
Wayne Brooks#1 Foreclosures Contributor
  • Real Estate Professional
  • West Palm Beach, FL
13,512
Votes |
23,418
Posts
Wayne Brooks#1 Foreclosures Contributor
  • Real Estate Professional
  • West Palm Beach, FL
Replied

 A couple of issues.....

No one knows where you are, all cities/counties are different.

Your zoning may not allow for a second unit, which this would be.

Owner issued permits are usually only for owner occupants, not for rental units.

First step, go down to your local zoning/building dept and see if this would be allowed.  If so, they’ll guide you on the possibilities of how you could do it.  Typically, plans stamped by an engineer or architect are required.

User Stats

3
Posts
0
Votes
Kitty Tan
0
Votes |
3
Posts
Kitty Tan
Replied

Hi, everyone. Thank so for your reply. I am in LA, and already checked zoning, it will be an ADU, which is allowed.

User Stats

628
Posts
491
Votes
Lee Bell
  • Real Estate Appraiser
  • Isabella lake, CA
491
Votes |
628
Posts
Lee Bell
  • Real Estate Appraiser
  • Isabella lake, CA
Replied

If you are in LA City limits you can find a lot of good info here.

http://zimas.lacity.org/

And here.

http://ladbs.org/

If you are in County territory they have info online too.

User Stats

49
Posts
46
Votes
Stephanie Trevizo
  • Rental Property Investor
  • Los Angeles, CA
46
Votes |
49
Posts
Stephanie Trevizo
  • Rental Property Investor
  • Los Angeles, CA
Replied

Hi @Kitty Tan , I've done it myself multiple times. However, I have a background in design. 

I've worked with 2 other investor friends this year who have permitted ADUs. They both needed full sets of drawings, including engineering. At that point, it was just easier for them to have their contractor pull the permit. Unless you yourself can do design drawings, you will basically be acting as a plan runner just visiting the city, and being the "middle person" could slow down the process. Hope that helps!

User Stats

3
Posts
0
Votes
Kitty Tan
0
Votes |
3
Posts
Kitty Tan
Replied

Thank you Lee and Stephanie for your information. I did all the drawings myself. And after I went to the building and safety office twice and some plan alterations, I got the building permit. 

User Stats

628
Posts
491
Votes
Lee Bell
  • Real Estate Appraiser
  • Isabella lake, CA
491
Votes |
628
Posts
Lee Bell
  • Real Estate Appraiser
  • Isabella lake, CA
Replied

@Kitty Tan

Are you planning to be your own general contractor?

Don't forget the in progress inspections by Building and Safety, and get it final and Certificate of Occupancy when it is done. Good luck.