Skip to content
Two investors reviewing resources on a laptop

Get industry-leading resources — for free

Unlock resources for every investing strategy and stage with a free account.

By continuing, you agree to BiggerPockets LLC's Terms of Use and Privacy Policy

Followed Discussions Followed Categories Followed People Followed Locations
Rehabbing & House Flipping
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

User Stats

50
Posts
37
Votes
Alexis DeAngelis
  • Property Manager
  • Raleigh, Raleigh-Durham area
37
Votes |
50
Posts

Flat 10% contingency is a superstition. What do you actually use?

Alexis DeAngelis
  • Property Manager
  • Raleigh, Raleigh-Durham area
Posted

Provocation, mildly held: flat 10% contingency treats a 1962 pier-and-beam and a 2005 slab build identically, which is obviously wrong — but nearly everyone (me included, for years) does it anyway because the alternative takes effort.

What our estimate-vs-actual data suggests: contingency should scale with property age, foundation style, scope share hidden behind drywall, and trade count. For context in our local RDU market:

  • 2000s–2010s Slab (Apex/Cary/North Raleigh infill): 5%–7% is usually plenty. You’re mostly dealing with cosmetic updates, non-load-bearing framing shifts, and predictable mechanical swaps.

  • 1980s–1990s Frame on Crawl (Garner/Wake Forest/Clayton): 8%–12%. You start seeing polybutylene pipe swaps, aging HVAC ducting in tight crawlspaces, and minor moisture/joist remediation.

  • Pre-1970 Pier-and-Beam / Vented Crawl (Inside the Beltline / Downtown Durham): 15%–22%. Between unreinforced masonry footings, chronic Piedmont clay drainage issues, sub-floor rot, outdated galvanized plumbing, knob-and-tube remnants, and RRP lead rules, 10% gets wiped out before the demo crew even leaves.

On our projects, the right number ranged from 8% to 25% depending strictly on those variables. So what do you actually do — flat %, line-item-specific, age-based, or 'my number is my number'? And has anyone's method survived contact with a pre-1970 house?"

business profile image
Atoriz

Most Popular Reply

User Stats

22
Posts
9
Votes
Maurizio Pisciotta
  • Delray Beach, FL
9
Votes |
22
Posts
Maurizio Pisciotta
  • Delray Beach, FL
Replied

I think this is much closer to reality than using a flat 10% across every deal.

For me, contingency should be tied to how much uncertainty is actually in the scope. Age matters, but I’d also look heavily at how much of the property is still “unknown” before closing. A 1960s house that has already had plumbing, electrical, roof, HVAC, and foundation work documented may actually be less risky than a 1990s house with poor maintenance and limited inspection access (rare, but it happens!).

I’d probably underwrite it in two layers: price the known work as accurately as possible line by line, then apply a higher contingency specifically to the parts of the project with hidden conditions (anything behind walls, under floors, in crawlspaces, structural work, old plumbing/electrical...)

With pre-1970 properties, I think the biggest mistake is assuming the contingency is just there for “a few surprises.” On some of those houses, uncovering problems is basically part of the scope. At that point, 15–20%+ doesn’t feel overly conservative...

  • Maurizio Pisciotta
  • Loading replies...