6 March 2025 | 17 replies
Free ACH rent collection on apartments.com and Rentmanager for the accounting elements.

3 March 2025 | 2 replies
It's a pretty complicated law with all kinds of tenant and environmental protections.

3 March 2025 | 0 replies
Environmental Protection Agency (EPA).

4 March 2025 | 7 replies
My approach emphasizes clean lines, natural elements, and a harmonious blend of form and function.I'm currently building up my portfolio and am seeking opportunities to collaborate on residential and boutique commercial projects.

1 March 2025 | 2 replies
90 day or more late is really a snapshot of the subprime element.

28 February 2025 | 8 replies
Further, the hottest locations may also provide for better future rent increases.The balance of cash flow/stability/appreciation is the human element that you can't necessarily extract from Excel formula.

26 February 2025 | 9 replies
Phase 1 environmental - Get this done in parallel to survey.

2 March 2025 | 26 replies
. Move outlet from behind range to more optimal location Install GFCI outlets within 4 feet of each other along counter space.o At Least two dedicated lines – all on GFCI breakers and at least one GFCI outletper circuit Install dedicated electrical circuits as follows:o Microwave: Dedicated 20-amp circuit (12/2 NM wire with a ground).o Garbage disposal: Dedicated 15-amp circuit (14/2 NM cable with a ground).o Refrigerator: Dedicated 20-amp circuit (12/2 NM wire).o Gas range: Dedicated 120-volt, 20-amp circuit (12/2 NM cable).o Dishwasher: Dedicated 15-amp circuit (14/2 NM cable with a ground).Bathroom Demolish existing bathroom elements. Install new cement board on floor and tub surround.o Seal with cement tape and red guard Install new fan, light, mirror, vanity, and replace toilet lid. Remove old tile and install new tile. Install new hardware and replace any old drain and supply lines. Install niche and tile from bathtub to ceiling. Install new bathtub and GFCI outlet. Light and fan on same switch Install all necessary plumbingLiving Room Install sliding door board trim. Install spot lights. Install 3-way switches in the hallway, living area and staircase (where marked). Install new air vent covers.Hallway/Staircase Install 10-inch LED light. 3-way switch (one near kitchen other near bedroom) Place laminate with Metal bullnose Install spotlights over staircase and one at landing at the bottomo lights on 3 way switchesBalcony Paint railing. Replace lightBedrooms Install spotlights in bedroom (up to four per bedroom). Install new fan. Spackle, sand, and paint. Paint closets and shelving, ensuring proper installation of shelves. Install spotlight in walk-in closet.Outside Paint stair railing. Install or repair 2 doorbells. Install or repair 2 exterior lights.Materials Included Cement/hardy board, drywall material. Granite slab for countertop and bar. Kitchen sink (D shape). Setting materials (thinset, grout, drywall tape, red guard, etc.). Baseboards, door, and balcony trim. Plumbing materials (excluding fixtures). Fastener screws.Total labor cost: $13,000

26 February 2025 | 6 replies
Always INDEPENDENTLY check:zoningcode compliance building classification local rules re Airbnb etc and whether you can assume those statusestitleinspection of building conditions environmental conditions schoolseverything else — this is not a complete list.Never trust/assume.

25 February 2025 | 3 replies
How SB-423 Accelerates Coastal Development: // Faster Permitting ·For projects with 150 units or fewer: - Eligibility Review deadline: 60 days from submittal - Approval deadline, including Design Review: 90 days from submittal · For projects with more than 150 units: - Eligibility Review deadline: 90 days from submittal - Approval deadline, including Design Review: 180 days from submittal · No public hearings or environmental impact reports for qualifying projects // Smarter Development Rules · Excludes high-risk areas, like those prone to sea-level rise · Ensures projects meet affordability and public investment requirements // More Housing, Less Uncertainty · Projects stay approved if at least 50% of units are affordable and include public investment beyond tax credits · Opens up new opportunities in previously restricted areas · Clearer guidelines help developers plan with confidence