3 April 2022 | 540 replies
Beneath the cracked cement, the ground is receded by about 6 inches.
15 April 2018 | 11 replies
The ten-second version is that you unroll it, cut it to size (utility knife or really good scissors), put contact cement on both the cabinets and the veneer, and then carefully stick the veneer down.