
6 October 2025 | 6 replies
.🔁 Syncs calendars via iCal (so it stays updated with Airbnb/VRBO).📆 Basic booking page — not as pretty as Lodgify, but functional.🏡 Great for one or two cabins if you want a simple “Book Direct” link right away.👉 https://zeevou.com🛠️ DIY Option: Boostly WordPress Templates (Free)If you want full control and are tech-savvy, you can host your own site for ~$5/month and integrate a booking widget (like Stripe + Smoobu free plugin).💡 Highest SEO potential (rank for “6 bedroom cabin Sevierville TN”)📊 Can integrate email list, blogs, photo galleries, etc.👨💻 Takes more setup time but pays off in the long run

6 October 2025 | 6 replies
I agree with the others-get them to clean it up and increase your rent with an updated lease.

24 September 2025 | 7 replies
Consider updating the photos to include different angles or lighting, or even adding a virtual tour to give potential renters a more immersive experience.

17 September 2025 | 11 replies
For larger projects we also try to send 1-2 in-process update videos.

10 October 2025 | 355 replies
Please give me your updates on the webinars.

23 September 2025 | 0 replies
Even with tighter spreads, I’m seeing investors find momentum by focusing on flips that check these boxes:- Strong ARV supported by comps- Cosmetic rehabs (paint, floors, landscaping) that add quick value- Areas with high buyer demand but low updated inventoryFor those flipping in today’s market:- How are you keeping projects profitable as costs shift?

11 October 2025 | 19 replies
Make sure it has curb appeal, the necessary interior updates, and features that draw potential buyers in.

1 October 2025 | 2 replies
The opportunity: Tighten operations around three levers—Cost, Time, and Revenue—while de-risking each flip with disciplined underwriting and execution.1) Cost: Tame Labor & Materials Without Gutting QualityValue-engineer the scopePrioritize visible ROI items: paint, flooring, lighting, curb appeal, kitchens/baths (surface updates > layout changes).Replace, don’t relocate: keep plumbing and electrical in place when possible.Use finish tiers (Economy / Mid / Premium) per neighborhood comp set; avoid over-improvement.Lock pricing earlyGet three-bid packages per trade with identical scopes, photos, and SKUs.Negotiate 30–60 day price locks on materials; ask for bulk-buy or “contractor pack” discounts.Use allowances (e.g., $2.50/sf flooring) with pre-approved SKU lists to control change orders.Build a dependable labor benchMaintain a preferred-vendor roster (primary + backup) for each trade.Offer fast pay terms (e.g., net-7 on verified milestones) in exchange for pricing and priority.Test small jobs first; promote trades to your A-list only after on-time, on-budget performance twice.Standardize to reduce wasteCreate repeatable finish schedules (same trim profile, faucet line, paint palette) so crews work faster and leftovers are reusable.Pre-kit jobs: one delivery per room (box includes all hardware, fixtures, and consumables).Contracting disciplineUse fixed-scope, milestone-based contracts with:Progress draws tied to inspections/photosNo deposit or minimal mobilizationLien waivers at each drawDaily liquidated damages for missed deadlines (after grace period)Written change order policy with price + time impact before work proceeds2) Time: Move Faster to Reduce Carry and RiskFront-load planningWalk the property with all key trades before closing; finalize scope, bids, and schedule ahead of day 1.Pull permits early; choose scopes that avoid structural or major MEP reroutes when timelines matter.Sequencing & overlapSchedule parallel workstreams (e.g., exterior/landscaping while interior demo proceeds).Use a Gantt chart (even a simple spreadsheet) to track trade start/finish, dependencies, and buffers.Daily control15-minute stand-up with GC or project lead each morning (photos + punch list).Two inspections/week: one quality, one progress vs. schedule.Keep critical spares on hand (breakers, valves, GFCIs, common trim, extra boxes of flooring).Tech + templatesSimple tools (Google Drive + shared photo folders, or apps like Buildertrend/Jobber) for scope sheets, punch lists, and photo proof.Use QR codes in rooms linking to the finish schedule for fewer “what goes here?”

4 October 2025 | 6 replies
After replacing the electric panel, painting, updating the kitchen, treating for termites and removing the popcorn ceiling i’m pretty sure we have about $50,000 or more in equity currently.

8 October 2025 | 16 replies
Transparency & CommunicationAsk how often you’ll receive updates (monthly reports, maintenance logs, rent rolls).Confirm that they have an accessible point of contact, not just a generic inbox.Watch for vague answers around communication frequency or reporting access.2.