18 November 2025 | 0 replies
As the tenant moved in the first week like 5 things pop up ( leaks/ Water heater not working and several other small things) the total is going to be about 800$ i found a local guy to repair them but his labor plus trip charges and parts are racking up, and hes cutting us a deal because his per trip charge is $125 Range.
16 November 2025 | 0 replies
**OPERATING COST REALITY CHECK:**- Insurance: +29% YoY (coastal exposure + reinsurance crisis)- Maintenance: +24% (labor + materials)- Property Taxes: +22% (reassessments catching up)- Condo Fees: +45% since 2021 (SB 4-D structural compliance)**MARKET DYNAMICS:**- Luxury ($1M+): 10.2 months inventory, seeing 10% discounts- Single-family: 6.4 months, still climbing 4% annually- Condo/townhome: 12 months inventory (buyer's market forming)**CAP RATE SPREAD:**- Miami core (Brickell/Downtown): 4.7%- Suburban (Doral/Kendall/Homestead): 5.3%- 60bp spread = biggest arbitrage opportunity in years**INVESTOR BEHAVIOR SHIFT:**Seeing capital rotate from luxury spec plays → workforce housing with stable cash flow.
19 November 2025 | 3 replies
Sometimes it's just a matter of cracks in old poured concrete or cinder blocks that just need an epoxy injection that might cost the day or so of labor plus material... maybe a few thousand max.
19 November 2025 | 0 replies
Lower Treasury yields typically support mortgage rates, which remain near recent lows at approximately 6.25% for a 30-year fixed – UMBS 5.5s are sharply unchanged on the day, despite lower treasury yields.The Bureau of Labor Statistics confirmed it will not publish the October jobs report due to the 43-day government shutdown, which prevented collection of household survey data.
13 November 2025 | 6 replies
Specifically 1099-MISC, not 1099-INT because it is not interest and not 1099-NEC because they do not provide any labor.
18 November 2025 | 1 reply
Build Cost EstimatesWe underwrite at today’s labor + materials, not what we hope it’ll be in six months.
18 November 2025 | 1 reply
This will give us the first glimpse into labor market health since the beginning of the shutdown.
10 November 2025 | 0 replies
so far it's been a labor of love, but i finally got it to scrape the entire site. now just trying to figure out how to improve my flow and other sites I should add to my sourcing engine. feedback would be appreciated!
14 November 2025 | 12 replies
Specifically 1099-MISC, not 1099-INT because it is not interest and not 1099-NEC because they do not provide any labor.