16 July 2025 | 71 replies
See below:Survey (8-10 weeks) Request Permit Prints from Design Team (4-6 weeks) Site Plan and Septic Design from Design Engineers. (6-8 weeks) Need survey back to start designs as this is site specific Energy Docs (1-2 weeks) Need plans from Design Team to make request.

10 July 2025 | 4 replies
.❌ Usually does NOT cover building materials or supplies being installed or used.Soft Costs (optional)✅ Can cover financial losses such as interest, permits, architect/engineer fees, advertising, and legal expenses due to delays from a covered loss.❌ Not available — not designed for construction-related delays.Increased Cost of Construction✅ May cover additional costs if building codes change during the project.❌ Generally excluded.Scaffolding, Fences, Temporary Structures✅ Often included.❌ Usually excluded.Debris Removal after a Loss✅ Typically included to clean up construction debris from a covered loss.🚫 May have minimal or no coverage.Testing of Systems✅ Some policies include damage caused during testing (like HVAC or plumbing systems).❌ Not applicable.In-Transit Coverage✅ Can extend to materials while being transported to the site.❌ Does not apply.Installation Coverage✅ Covers materials as they are being installed into the building.❌ Not covered.

4 July 2025 | 21 replies
Do you really think there is no financial engineering at play with apple, or tesla, for the purpose of making money on playing stocks themselves when in its inception the idea behind stocks was democratizing ownership so companies could expand and in that relationship more value is created that is then shared by the whole of society that is participating?

16 July 2025 | 11 replies
So now I apparently have to get architectural and engineer plans and for this project which is a huge expense I wasn’t anticipating.

27 June 2025 | 2 replies
Now the county snaked and camera the line again - they are saying there are no broker pipes no on the house side and no on the city side (we requested the camera video but this is a public record request and will take time).The last update I received now is that the city service director and a city engineer conducted an hour of investigation on the property.

9 July 2025 | 6 replies
Make sure the cash flow projections are actually coming from operations and not just financially engineering a return (read: over raising to fund the first couple year distributions).

16 July 2025 | 9 replies
The head engineer I spoke with laughed and told me that guy providing the low quote was the best qualified and had an impeccable record.

15 July 2025 | 6 replies
Cash flow is non-existent after debt service and those distributions they are projecting are all just financially engineered by over raising equity on the front end to pay you back, giving the appearance of cash flow.

18 July 2025 | 13 replies
If so that is a huge first step, then you would want to get the markets they play in, their pricing engine so you know once you get a deal under wraps, it should pen out.