
18 December 2020 | 4 replies
Also, install a drain pipe all around the home with fabric sleeve and gravel ontop, and back fill.They have already done this to pump water out :Installed sum pump at crawlspace, dug out a 1’ foot hole at lower spot of the house and drainedthe water away to avoid the formation of mold at the inside of the house.

15 October 2020 | 5 replies
(In other words it’s my job to make sure everyone gets in and out of the deal with money in their pockets and not in “unexpected mishaps.” cause if ya get the #s right in the first place there shouldn’t be any reason for something to take ya off track) Although you mention having experience is a leg up, but as a man who works as a welder fabricator/ plumber I obviously have none other than the research I’ve been doing independently for the last 6 months.

23 October 2020 | 11 replies
You'd need pipefitting and welding skills to fabricate something like the heat exchanger.

9 November 2020 | 9 replies
I've fabricated 3 fire pits for my STRs, and I stock them with firewood.

12 November 2020 | 1 reply
I fabricated a 4' x 4' firepit to keep at a 14 unit STR apartment complex.

12 March 2021 | 9 replies
There are exceptions, such as waiting for cabinets to be fabricated or things like that, but you probably get the point.

26 January 2021 | 0 replies
I'm in need of a countertop fabricator and installer with investor type pricing who does work in Farmington.Thanks!

1 February 2021 | 2 replies
The second would be to fabricate and sell furniture.

29 December 2020 | 15 replies
He is denying me this benefit I earned by serving over things he has fabricated.