Skip to content
×
Pro Members Get
Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
ANNUAL Save 16%
$32.50 /mo
$390 billed annualy
MONTHLY
$39 /mo
billed monthly
7 day free trial. Cancel anytime
×
Try Pro Features for Free
Start your 7 day free trial. Pick markets, find deals, analyze and manage properties.
All Forum Categories
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

All Forum Posts by: Alazar Wubet

Alazar Wubet has started 28 posts and replied 55 times.

Post: Basement height too short

Alazar WubetPosted
  • Posts 56
  • Votes 6

I Just learned my basement height is below 7' and was trying to explore options. I have tried to go down the digout path but there isn't enought space under the slab. Is there any contractor you have worked with and can recommend and do you have any idea how much an underpinning could cost in DC

Quote from @Aaron Schrader:

Keep in mind I don't know you, your market or this house, but if someone in my area were looking at an expenditure like this and said "3 bed houses don't sell in the area", the first thing I'd want to see is proof, which would be just pulling the sold listings off the MLS in the area and looking at days on market. I guess I just question big statements like that only because they often can be formed off of what people hear, and not what is true. But if you know this answer definitively and know it will bring the value then go for it! Best wishes for your project.


Thank you so much! Been looking at the MLS and i may have found a workaround for this

Quote from @Jack Seiden:
Quote from @Alazar Wubet:
Quote from @Jack Seiden:
Quote from @Alazar Wubet:

I'm flipping this house in Washington D.C and needed an extra bedroom. The two options were digging out the basement and adding a bedroom there or adding an additional floor and putting the bedroom there and leaving the basement as a living space. 

from bids i received i realised it'll cost almost equal for both but i can't find an answer if the permitting process would be lengthy for the addition. 

which way do you recommend i go?


 W/o knowing the details of your deal, dealing with dcra and spending well over 6 figures to add a bedroom hardly seems worth it, if you made a mistake you may have to eat a loss, but don’t compound your issues, I only stick to projects that don’t invoke architectural permits in dc but I’ve heard it can easily run 9 month even more if your in an historic district just to get permits.

Thank you! Do you mean 9 months for permitting? 


 I can’t speak for you specific project, but I certainly know people who have waited that long for architectural review. 


 Thank you. I'm working with my architect to just change the layout and add the bedroom in the original structure because the last thing i want is sitting on this house for long

Quote from @Bill B.:

Another question. Does below grade living space count in your market? Some markets you aren’t allowed to count below grade living space.

Here’s a lot of dc info including needing a new coe when you buy

https://realestateinthedistric...

But here’s a page just what I thought…

https://dc.urbanturf.com/articles/blog/the_square_footage_game/1526#:~:text=In%20short%2C%20the%20square%20footage,%2C%20dining%20room%2C%20etc.)

In short, the square footage for a property in DC consists of the above-grade finished living area. According to the DC Property Tax Division, that is “comprised of the finished areas of the main floor (kitchen, living room, dining room, etc.) and any finished areas above the main floor.” The basement is not usually included in the calculation.

You might get extra value for finishing the basement but you can’t advertise the finished space. I was thinking if you built out then you have the more valuable addition that you could always build under later. They’re more likely to prevent future above grade building than below. 

Ps. I did just notice the article is 10 years old, so you might want to ask a realtor.


 If you're asking if i can call a bedroom below grade a bedroom and sell it as such, yes i can do that. But i understand that having one above grade has more value when selling

Quote from @Michael Diossa:

As mention above.....Permits.


 Care to explain?

Quote from @Jack Seiden:
Quote from @Alazar Wubet:

I'm flipping this house in Washington D.C and needed an extra bedroom. The two options were digging out the basement and adding a bedroom there or adding an additional floor and putting the bedroom there and leaving the basement as a living space. 

from bids i received i realised it'll cost almost equal for both but i can't find an answer if the permitting process would be lengthy for the addition. 

which way do you recommend i go?


 W/o knowing the details of your deal, dealing with dcra and spending well over 6 figures to add a bedroom hardly seems worth it, if you made a mistake you may have to eat a loss, but don’t compound your issues, I only stick to projects that don’t invoke architectural permits in dc but I’ve heard it can easily run 9 month even more if your in an historic district just to get permits.

Thank you! Do you mean 9 months for permitting? 

Quote from @Aaron Schrader:

I think a question I have right away is does adding a bedroom add this much value to justify the time and expense?

Yes, 3 bedroom homes just don't sell in the area 

I'm flipping this house in Washington D.C and needed an extra bedroom. The two options were digging out the basement and adding a bedroom there or adding an additional floor and putting the bedroom there and leaving the basement as a living space. 

from bids i received i realised it'll cost almost equal for both but i can't find an answer if the permitting process would be lengthy for the addition. 

which way do you recommend i go?

Quote from @Jack Seiden:
Quote from @Alazar Wubet:
I made the rookie mistake of having a fellow rookie contractor who walked out on me. on our pre-purchase inspection he told me the basement height is above 7ft and can pass inspection but after purchasing the property i discovered it's below 6'8 and can't pass the D.C. inspection. I talked to several contractors and the options i found are; do a dig-out, lift the whole house, or ignore the basement and sell it as storage. Is there anything you guys can recommend please?

 Realistically the cost of a dig out is likely to at best equal the value it adds.


Thank You. i will try to consider it from that angle
I made the rookie mistake of having a fellow rookie contractor who walked out on me. on our pre-purchase inspection he told me the basement height is above 7ft and can pass inspection but after purchasing the property i discovered it's below 6'8 and can't pass the D.C. inspection. I talked to several contractors and the options i found are; do a dig-out, lift the whole house, or ignore the basement and sell it as storage. Is there anything you guys can recommend please?