5 September 2024 | 1 reply
I'm also looking to add a flower farm and speakeasy.
3 February 2017 | 1 reply
And getting closer to being ready to learn from experience.My most intriguing one yet:Two buildings on one lot:3 bedroom 2 bathsBut there is an RV parking spot with 30 amp outlets I could probably charge 775 for the 2 bedroom and 585 for the single.
21 October 2024 | 6 replies
Networking is key, especially when you’re just starting out.
10 September 2014 | 10 replies
It's quicker to do all laminate though and may outlast tile.Ollies bargain outlet has laminate but it's not any better or of any better value than box stores.You can buy a shipping container of laminate from China on alibaba which may have some added savings if you have a lot of flooring to do.I typically don't bother with an underlayment because it is added cost and provides little value IMHO.
6 April 2019 | 4 replies
I have a rental and I am wondering if I can depreciate mulch, gardening soil, annual flowers and perennials?
6 March 2020 | 6 replies
none are a bad thing, all fixable but know what you are getting yourself into.Check every outlet with a tester.
22 March 2018 | 12 replies
The actual lake called Clear Lake does have a coastal outlet and a yacht club, and Armand Bayou Nature Center is a delightful park with multiple playgrounds, wooded paths, and a sizable dog park.
23 October 2024 | 3 replies
I'm in Denver as well and always love to chat about RE and how we could help each other out.
30 June 2016 | 91 replies
Phase 11) Remove sub floor and replace2) Demo drywall on ceilings3) Replace insulation4) Inspect roof(repair as needed)5) Repair floor joists6) Test electrical, update outlets and switches.7) Upgrade electrical panel for additional A.C. units.8) Install new rough in plumbing for bathroom.9) Rough in electrical, install lights for bathrooms and GFI''s10) Install new sub flooring in bathroom11) Install tub12) Tear down paneling in wall and make ready for dry wall.13) Tear out closet floor and replace.14) Remove all debris and haul away.Will be completed by Friday.