Skip to content
×
Pro Members Get
Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
ANNUAL Save 16%
$32.50 /mo
$390 billed annualy
MONTHLY
$39 /mo
billed monthly
7 day free trial. Cancel anytime
×
Try Pro Features for Free
Start your 7 day free trial. Pick markets, find deals, analyze and manage properties.
Results (10,000+)
Geoffrey Tanudjaja [Calc Review] Help me analyze this deal
14 February 2019 | 4 replies
They have cabinets down there and space that I might be able to turn into a kitchen down the road.
Danny Crawford Estimating Contractor cost
29 March 2019 | 2 replies
I'm getting new flooring, kitchen cabinets and appliances, lighting, painting and bathroom. 
Earl Gaines Multifamily House-Hack BRRRR
28 July 2020 | 11 replies
I used the Home Depot Pro points to save on lots of paint, and then was able to shop around my town for deals on new appliances and cabinets.
Account Closed WSJ article on impending CRE bubble
3 October 2015 | 87 replies
Cabinet makers  etc etc.And on the fix and flip we do we have well over 100 projects going at any one time I can't even count how many folks that helps... so there is more to it than just our personal gain.. and we hope that all those that work with us appreciate what we do to help them..
Will G. Am I stupid for considering this multi?
13 March 2018 | 4 replies
look it up on loopnet in maryvilleThis property defines "deferred maintenance" and needs every bathroom, fixture, cabinet, door, window, floor, appliance, septic systems, supply plumbing,(currently galvanized) hvac systems,water heaters etc replaced, plus all the cosmetics.rehab would easily be over $200k , but the 50 year old septic systems might last a little longer!
Allison Anderson Cost to Finish House
31 July 2018 | 8 replies
 Assuming the Exterior is completely dried in, the next steps to finish the project would be:Drywall or Wall Finish - a Cabin in Montana might prefer a Wood Finish instead of the Drywall we typically use in Arizona - Possibly a combination of both; I suspect Drywall would be least expensive but maybe not as Aesthetically correct.Assume an inspection is required to confirm proper Nailing of Wallboard prior to next steps - Make sure Wiring and Plumbing passed inspection prior to installing Wallboard.Tape, Texture, and Paint - If Drywall is used, not required for a Wood Wall Finish, but Wood might need to be Stained and Sealed.Flooring - Carpet, Tile, WoodMillwork - Cabinets and CountertopsElectrical Trim - Includes installation of Electrical Outlets, Switches, and Light Fixtures. 
Peter Schultes Layout Question for a BRRRR full rehab
1 April 2018 | 4 replies
That being said, would the properties be more valuable if I left the first floor in the same layout and add a half bath to the dining room, or would it make more sense to move the kitchen cabinets and appliances into the dining room since there'd still be room for a table and make a laundry room and half bath out of the kitchen area? 
Chris Nowlin I trust my contractor to do everything...except answer his phone
20 July 2018 | 3 replies
Worker supposed to show up - Doesn't Show - Call/Text GC - No Answer - No Answer - Finally Answers - Insert ExcuseOn my project he was only working on the cabinets, for the other two, he did a majority of the work.
Christopher Kolasa First Deal - Rehab questions - how much living space?
31 October 2019 | 8 replies
I’ll post a picture of a slab that cost $500 and $1100 to cut - this was enough for a kitchen and 2 bathrooms.Same $500 slab in another kitchen:Also, as you can see, for rentals, I’m a fan of darker colored cabinets
Quentin Mitchell My very 1st multifamily deal
25 November 2019 | 8 replies
@Joseph Konney: The upper unit the guy I bought it from had started the work already, so there was little to do  besides paint and finish bathroom floor paint and light fixtures and same with Kitchen and 1 cabinet and I repainted because the color he had was awful.