Skip to content
×
Pro Members Get
Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
ANNUAL Save 16%
$32.50 /mo
$390 billed annualy
MONTHLY
$39 /mo
billed monthly
7 day free trial. Cancel anytime
×
Try Pro Features for Free
Start your 7 day free trial. Pick markets, find deals, analyze and manage properties.
All Forum Categories
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

All Forum Posts by: John A Murray

John A Murray has started 6 posts and replied 142 times.

Post: Building an ADU in San Jose

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

Developer fees such as this one are going away Jan 1 2020 for ADU's under 500sf, and reduced fees for those over 500sf. Sounds like you're stuck with them-ouch! I'll save $5k in developer fees by waiting but will have yo solar PV the ADU;maybe do the sfr at the same time.

Post: Two ADU/JADU per SFR

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

I believe you can have either an attached or detached ADU and an attached (integral like a bedroom) JADU. With development fees going away or being reduced Jan 1 2020 I believe you would want to wait until the new year BUT you will be required to solar panel the ADU.

Post: Garage Conversion to ADU

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

Have a plan drawn up and speak to some contractors. I believe they could give you a rough idea BUT make sure you are aware of new energy regulations that mandate solar panels and that PG and E is ok with the location of the power lines. There is no set in stone cost sheet this will require due diligence on your part.

Post: Updated California Title 24 2019 Energy Standards ADU

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49
Thank you for the great info Jason-    Originally posted by @Jason Gettler:

The Info I am having trouble finding relates to the 2019 energy standards. I read the new language but its hieroglyphics to me. I know I'll need solar but not sure what all the other changes are ie windows-insulation etc.

Jason could I leave the ceiling open, roof sheathing exposed and painted, or must I insulate and drywall?

Post: Property in or around City Heights

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

https://maxablespace.com/about-maxable/

I would call them for a free consult; they are located in San Diego. Let us know what you find out.

Post: Property in or around City Heights

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

You can have 1 ADU and 1 JADU in addition to 1 SFR.

Pretty clear that basement room is not permitted, but would make for a JADU. You would have to ensure it's up to code which could be a pain to do. If you know a good contractor have him take a look, or there is a company near you, Maxable, which specializes in ADU/JADU's. They can help you. Get all the info you can from the current owner, especially since he was the owner who did the work. He could have plans, drawings, receipts etc.

Which leaves you with the ability to build an ADU. Don't think the zoning would have any effect at all on the ADU/JADU. Only thing to worry about is how many dineros you have in your wallet.

Post: California ADU business

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49
Yes big difference between ADU and JADU. I
have a back bedroom with bath that would make a perfect JADU; just set up a kitchenette and put in an outside door and an inside door. Don't know if I want to have someone living that close but I believe it would add value when I sold. Buyer would have the option to rent or not The ADU and the JADU would make their mortgage payment. That's worth something, no?

Post: Updated California Title 24 2019 Energy Standards ADU

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

Waiting to get started on my ADU on 1/1/20 to get away from developer impact fees ($5k) but will have to solar power the ADU. I was advised that garage conversion ADU's are considered as new construction for purpose of complying with multiple new requirements. I have been having trouble getting complete information on this.

Any info or advice on new requirements?

Post: California ADU business

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

An Appraiser recently told me that he would value a "builder quality" $50k garage conversion ADU at maybe around $20k, due to the requirements they have to follow. I believe a similar situation is when there is an overbuilt structure; the buyer has to come in with more cash. As David M. stated above, having something that would pay one-half of your mortgage payment is quite valuable. May be better to find a property with an existing ADU than developing one on your existing property?

Post: Southern California ADU (SB-13) granny flat

John A MurrayPosted
  • Rental Property Investor
  • Long Beach, CA
  • Posts 145
  • Votes 49

Hi Derek,

My understanding is that the only way to get this done is that you can pay LADWP to move the power lines. They are a grand bureaucracy; very slow and very expensive. I heard about $9,000 and get in line.

Don't forget solar power required after 12/31/19.

Kind of crazy as SoCal Edison isn't making this an issue. Years back they moved our power line to run directly over the pool, so I had them out and they said "no big deal" if there is a pool or a structure under power lines. Go figure.

One of the new laws addresses turnaround time for approvals, but don't know if/how that applies to revisions.

Tim G. gives great advice: "Be ready to deal with stupid rules that apply to us for reasons that don't always make sense. Accept it and find a way to make it work. Taking the path to least resistance when it comes to building departments and focusing on the end goal (a cash flowing unit) over it having a specific size or design that we wanted".