
14 June 2015 | 18 replies
My wife and I Rehabbed the property by knocking down walls, remodeling bathrooms, redoing the kitchen, replaced roof, added new flooring, and some other stuff over the last 2.5 years we have lived there.We found a great tenant (hopefully) to Rent the house from us by utilizing the guides and info here on BP.

9 June 2015 | 16 replies
Additionally, the wood border in the kitchen was also removed from the original position and the nails on the wood may potentially hurt my two young kids.

9 June 2015 | 0 replies
Don’t provide the lender with everything and the kitchen sink: Only provide items on the list provided.

12 June 2015 | 30 replies
Instead of a $2500 fix, it became a $500 fix for labor and dirt.Rehab Scope: Roof, ext/int paint, kitchen, new flooring throughout, update both baths, new plumbing to replace missing copper, furnace, rear deck, doors/trim, etc.UNFORESEEN Delay: On many of our deals we tend to partner with others, and those usually go smoothly.

23 July 2015 | 16 replies
Nice, shiny HW floors, modern kitchen and bath, etc.How would you structure this deal?

10 September 2015 | 6 replies
They all range in the amount of work needed upfront (roof, flooring, kitchen(s), bathroom).

11 June 2015 | 12 replies
Another option you may want to consider should you exhaust your MFH search is a SFH with an in-law suite that has its own entrance & kitchen/kitchenette.

10 June 2015 | 4 replies
Exterior work (siding, roof, windows), drywall, flooring, painting, kitchens, bath, miscellaneous electrical, plumbing, etc....

13 June 2015 | 6 replies
Off the top of my head it needs:-Kitchen -Appliances-Flooring on all of first floor-Paint-TLC in bathroom-New carpets on second floor-Light plumbing-New windows in basementI will hopefully have it inspected by the end of the weekend.

24 June 2015 | 36 replies
Brand new cabinets (pipe burst and they had to be replaced but they replaced with nice cabinets and formica plus low end appliances). no one has lived there since the pipe and rehab was done so there is little to be done other than kitchen, baths, floors and paint.