16 July 2024 | 8 replies
The recent consecutive mistakes have been so EGREGIOUS, that I honestly thought that it was either A SICK JOKE, or some coordinated attempt to push out some of their tenured clients.
21 March 2019 | 162 replies
I think Im going to have to bite the bullet and hire an assistant to get it done.for sure my wife has a transaction coordinator she does not do her own paper work follow up.. trans coordinator for high volume agent is a must in my mind.. leaves her time to sell sell sell
5 December 2018 | 3 replies
I'll send you a PM and hopefully we can coordinate something.
17 May 2023 | 29 replies
I'm still interested in switching if RentRedi can address the issues I mentioned.I just looked though, and the maintenance coordination costs $25/month and $12/property.Then, they will handle all maintenance calls, hire someone to address the issue, and bill you for labor+materials 👍
13 September 2020 | 0 replies
His operation is getting too big for his house and he’s having a hard time coordinating with all his volunteers.
4 October 2021 | 14 replies
It takes a lot of coordination and planning but I believe that 1031 Exchange is key to building wealth as a RE investor.
9 November 2018 | 38 replies
Should anyone still want to buy an IKEA kitchen at IKEA, here is my review of the appointment / assembly process, which she/he should plan with: 11.05.2017 1.surveying appointment at home: normal 15.05.2017 1.planing apptmt at IKEA: normal 12.06.2017 1.installation apptmt at home: Planning error (measures copied incorrectly), broken kitchen appliances, broken TV, cabinet gaps, no worktop 13.06.2017 2.planing apptmt at IKEA: complete replaning due to 40cm length planing error 28.06.2017 2.installation apptmt: incorrect parts delivery, scratched, incorrectly cut worktop, broken rear wall 04.07.2017 2.surveying apptmt: new measurement for worktop 13.11.2017 3.installation apptmt: worktop supplied by 5cm too narrow 02.06.2018 4.installation apptmt: worktop supplied by 2cm too wide & 2cm too short about 12 repetitive hotline calls (always longer than 30min) including waiting loop 10 WASTE HOLIDAYS 26 Email pure for the coordination of the kitchen installation 43 Email with IKEA "customer service" for the misclaimed "claim settlement" 300 € collateral damage Zero compensation (91 € were offered to me, which I refused) Conclusion: NEVER AGAIN IKEA !!!!!
20 May 2020 | 19 replies
I’m going to spend some time researching a bit more, but will definitely reach out to coordinate a call in the near future.
9 June 2019 | 192 replies
There are exceptions of course, specialty materials with long lead times, other "unique" job items, but those I would purchase directly and have delivered to the site, possibly in coordination with your contractor.
23 November 2021 | 2 replies
The manager could do the cleaning flips and some maintenance themselves, or they could coordinate and delegate these responsibilities.Considering a base plus commission based on reviews and occupancy rates for an incentive - probably cap at $40-50k annually for a part-time position.