3 June 2015 | 13 replies
Downstairs: gutting and opening up the kitchen, adding a dishwasher, gutting and enlarging the main bathroom and gutting the 1/2 bath, enlarging the master bedroom closet, adding laminate floors and new paint.
22 April 2015 | 14 replies
child is annoying my housemate on the 1st floor as well as myself when I'm actually home.
20 June 2015 | 15 replies
My thoughts were to remove it...possibly add drywall, and paint/ flooring.
5 March 2015 | 2 replies
The area is very depressed and I was leaning toward a new construction for the space.My mouth hit the floor when he stated that to purchase the lot with him would cost me $2,500.
1 March 2013 | 9 replies
Expanding on that: Can I separate some of the fix up costs like flooring, the new hot water heater, the new fridge, etc and make each of these separate assets for their own depreciation.
15 March 2013 | 6 replies
Hello everyone.My name is Mark Colburn and i'm a new member to BP.I bought my first property in Nov of 2011 and it was a multifamily side-by-side duplex.It was a bank owned property that we did an extensive renovation to including two new kitchens, two new bathrooms, new flooring, new paint, new water heaters, new vented bathrooms, tons of repairs to walls (was prior section 8) etc.All in all I spent about one year and $35K on the renovation.
10 July 2013 | 29 replies
It is the same floor plan, same level, pretty much the same.
5 March 2013 | 14 replies
Its a 2 story building with 2 units on each floor and an unfinished basement.
1 March 2013 | 6 replies
Replace existing carpet with engineered hardwood flooring and baseboards - approx. 475'2.Paint entire interior of townhouse3.
29 March 2014 | 40 replies
.$3000 is due upon the completion of refinishing hardwood floor $12000 is due upon the completion of the tile wall and floor installation in the bathroom and installing kitchen cabinets countertop $7500 is due upon the completion of building the storage house in back yard with most of the landscape work prepared or done.$4000 is due upon the completion of the interior and exterior paint.$3500 is due upon passing city final permit inspections. balance of $3000 is due upon the completion punch list