Skip to content
×
Pro Members Get
Full Access!
Get off the sidelines and take action in real estate investing with BiggerPockets Pro. Our comprehensive suite of tools and resources minimize mistakes, support informed decisions, and propel you to success.
Advanced networking features
Market and Deal Finder tools
Property analysis calculators
Landlord Command Center
ANNUAL Save 16%
$32.50 /mo
$390 billed annualy
MONTHLY
$39 /mo
billed monthly
7 day free trial. Cancel anytime
×
Try Pro Features for Free
Start your 7 day free trial. Pick markets, find deals, analyze and manage properties.
All Forum Categories
All Forum Categories
Followed Discussions
Followed Categories
Followed People
Followed Locations
Market News & Data
General Info
Real Estate Strategies
Landlording & Rental Properties
Real Estate Professionals
Financial, Tax, & Legal
Real Estate Classifieds
Reviews & Feedback

All Forum Posts by: Jim Adrian

Jim Adrian has started 8 posts and replied 1668 times.

Post: Help me evaluate three options for offloading current rental ?

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

Tearing it down would be my last option.  If you build a tri-plex are there others in the neighborhood that would allow this to blend in?  Assuming there is not.  To build new, you lost 8 months of rent that covers your mortgage that you would have to cover on top of new construction cost.

Post: [Calc Review] Help me analyze this deal. We're new... Good deal?

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

You should look at your insurance numbers as they seem low (48*12=$576).   Cash flow looks good.  Look at the management fees.  Will the 11% cover both units?  Typically I see people say 10% for one sfr. 

Post: Property Damage and Breaking a Lease

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

When the tenant leaves take photos of everything and video walk thru the unit.  Save this for proof.   A tenant of 7 years I would let break the lease with no fee.  I would not charge for nail holes and painting as this is wear and tear.  I would give the walls a good cleaning and see what they look like.  Most likely you will need to repaint the entire place.  Review your lease to see what you can charge them for.  You should have this spelled out, if not update your lease.  This should include fees as well.  Items  truly damaged and or with holes needs to be replaced and fee charged.  Keep all receipts of work for proof.  Fix the water leak.  Now would be time to rehab the unit.

Post: Rental Screening Criteria

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

I have added (suggested) after some of my requirements in fear of scaring people off.   At the same token, scaring them off, help weed out the problem people.   I do have score sheet as well.

Post: How do you make money flipping?

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

Big cost items are moving plumbing, moving mech etc.  Why is this a complete gut job?  I bet there are areas that don't need to be gutted.  Plans and scope of work is key.  Having plans established quantities and eliminates the unknowns.  Maybe create a list of "needs vs wants" and see what you can cut out.  Someone is going to have to draw up plans to get permits before any new work can start.  You can demo without a permit typically.  May be its time to regroup and get plans first.  Then get multiple bids.  Chalk up the extra cost as lesson learned.

Post: What’s fair for repairs on move out?

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

@Rocky Lalvani

If the holes are from nails hanging pictures then that's wear and tear but if its 6" or bigger that's a fee.  If the carpet wasn't brand new when the moved in then its wear and tear, no fee.  A lot times the cheapest carpet is units and wont last 3 - 5 years.   Be careful about nickel-and-diming.  You should (need?) receipts showing proof of work or materials.  

Sounds like a lease update is needed to include "Condition of Property Assessments" that include a price break down for damages.  This way damage fees are already defined and agreed to at the time of lease signing.  Simply reference the item.   I include move out instructions on here as well.  Here is a portion of my fees.

Assigned Assessments:(if applicable)Assessment Charge:

  1. Refrigerator to be clean$75
  2. Range/Oven to be clean$75
  3. Bath/s to be clean$25 per fixture
  4. Painting of Woodwork fee$30/sq ft
  5. Garage to be cleaned out of trash & swept out$25
  6. Driveway to be clean of oil and debris$25-50
  7. Gutters to be cleaned (yearly)$75
  8. Yard to be mowed & trimmed properly including shrubs/bushes$50+
  9. Walks & drive to be clear of ice and snow$50
  10. All light fixtures are to have the proper sized working light bulbs$20/bulb
  11. Rooms to be in good clean condition$75/per room
  12. Attic Ventilation – Repair (per Care of Premises)$200+ minimum
  13. All trash to be removed and hauled out (dumpster rental $200)$25 or at cost
  14. All keys to be returned$20/key
  15. Carpet replacement$15 sq yard
  16. Carpets / floors to be professionally cleaned$75+
  17. Carpet / floor stain removal$15/stain
  18. Basic Labor Hourly rate for repairs$40 per person
  19. Plaster wall repairs ie nail holes and etc$25/hr
  20. Drain lines pluggedAt cost
  21. Wood floors scratches or repairs beyond wear and tear$50 or At cost
  22. Ceiling fans cleaned (blades and light fixtures)$40
  23. Items not covered$25 or at cost

It helps to inventory the condition of the place and note remaining life expectancy on equipment.   Ie AC&Furnane is 10 yrs old so it has 10-15 yrs left. Replacement cost at ~$7000.  So $7000 / 10 yrs = $700,  $700 / 12 months = $58.   But this depends on the condition of the house and not everything will break at once.  Remember to look at the numbers and see what you can buy for that amount.  % may need to be higher due to buying power.

I use 10% for capex, 10% repairs, 6% vacancy (1 month of mortgage and utilities) and 10% PM.  I like to keep at least 5-10% of the property value on hand.

Here is a link to typical life expectancy of items.

www.nachi.org/life-expectancy.htm

Post: Omaha plumber/drain cleaner

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

Backlund.

Post: What to do with a Mansard Roof?

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840
Originally posted by @Nik Moushon:
Originally posted by @Jim Adrian:

One problem you will face by using asphalt shingles is how to do you transition to the top portion of the roof that is flat.  Asphalt shingles require a 3:12 pitch to drain and  maintain weathertight warranty.  Yes, you can install them on a lower slope but you will void the warranty. This roof will not have a 3:12 pitch, I bet.  At this point you need a to use a "Standing Seam Metal roof" that allows for  1/2":12" or 1":12" roof pitches.   You may need to use a "structural" standing seam vs an "architectural" type of standing seam roof system.  An architectural type is a push/snap on rib closure system vs a folded seam.

 You are correct about asphalt shingles needing to be 3:12 or greater slope but the transition to a flat roof is not as hard as it appears and is a very common detail in construction. Most roofing manufactures have details for this condition. Most mansard roofs actually do not have a flat roof on the top, especially in single family houses. It is common in larger commercial and multi-family buildings though. But in those situations the transition is handled by using a parapet wall. So the peak of the shingle roof is at least 8" above the flat roof. The flat roof is also almost always going to be a single-ply membrane material not a standing seam roof because its much cheaper and no one is ever going to see this part of the roof except if you're standing on it. 

And for anyone that doesn't know when flat roofs are not actually flat. There's usually a minimum slope of 1/4" of 1/2" per foot. FYI 

 All this is true. All depends on the conditions of the building.  Too many unknowns to give a single answer.  If you have the slope of 3:12 then go for asphalt. 

Post: New tenants put cardboard over windows

Jim AdrianPosted
  • Architect
  • Papillion, NE
  • Posts 1,675
  • Votes 840

This would be considered an alteration to the property and this is not allowed in my lease.  Would I get upset, no.  Would they be removed, most likely.