All Forum Posts by: Mayer M.
Mayer M. has started 100 posts and replied 795 times.
Post: Help with 42 unit pruchase

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Donna Greene
What makes it a great deal?
Post: Hard money lenders and COVID restrictions

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Garrett Culpepper
In all honesty sounds like your margin is too tight if a refi will eat up your profit.
Could your share the details of your properties? Numbers, Location, property type (i.e. single family, duplex, etc.)
You haven’t answered why you didn’t use a traditional bank for the funding. Bad credit? Bad margin?
Post: Hard money lenders and COVID restrictions

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Garrett Culpepper
Just tell them due to COVID you need a 3 month extension
Why haven’t you used a traditional bank for funding?
Post: Vacant Land Palooza ~ New Construction Costs Philadelphia

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Jared Forman
Agreed.
I was having a GC bid out 3 new construction duplexes and 2 renovation triplexes and they wouldn’t do the renovations
Post: Insurance and perm financing question 28 unit

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Mayer M.
Bump
Post: Package system for multi family....amazon locker?

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Mayer M.
Bump
Post: Package system for multi family....amazon locker?

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
I’m working on a ground up 28 unit multi family and want to put a package system like an amazon locker in my lobby for residents.
I tried getting an amazon locker directly from amazon but I guess my location doesn’t qualify.
Does anyone know and can recommend a package delivery/return system similar to the amazon locker, but that can work with all delivery vendors such as amazon, ups, fedex, usps, etc?
Post: Insurance and perm financing question 28 unit

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
Hey all,
Working on building a 5 story 28 unit building. I may have the opportunity to do all wood construction and avoid the cost of steel.
Using construction like this, are there any issues getting permanent financing or insurance once stabilized?
Thanks!
Post: Vacant Land Palooza ~ New Construction Costs Philadelphia

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Niaz Butt
I’m either calculating it based on a similar project or using a cost psf that I know is very conservative
For developers who’ve done many many projects they have the advantage of having so much more knowledge than I do
Post: Vacant Land Palooza ~ New Construction Costs Philadelphia

- Investor
- Cherry Hill, NJ
- Posts 860
- Votes 323
@Alex Capozzolo
Troy could speak to this better than me, but I’ll provide some input.
You could very well need structural steel for a 4 story building, just because it’s five stories doesn’t mean you can do all stick frame. For example, parking under the building would require steel, if the spans call for it you could need steel.
Also, just because you are five stories or more doesn’t necessarily mean you need steel either, or perhaps you could do a mix of steel and wood frame
Lots of variables and really need a plan set and a structural engineer to sort these things out